|
Electrical Installation Work – Design And Implementation Of Power Supply Installations And End Points Of These Installations At Passenger Stops And Railway Stations. The Subject Of The Order Is The Design And Construction Of Power Supply Installations And End Points Of These Installations At Passenger Stops And Railway Stations. The Ordering Party Reserves That, As Part Of The Implementation Of The Basic Order, It Is Possible To Limit The Scope Of The Basic Order By Reducing The Number Of Passenger Stops And/Or Railway Stations Covered By The Development Of Design Documentation And The Implementation Of Construction Works. The Reduction In The Scope Referred To Above May Apply To A Maximum Of 10 Facilities From Those Indicated In The List Constituting Annex 2 To The Ffu. The Scope Of The Order May Be Limited If The Railway Lines Plant Of Pkp Polskie Linie Kolejowe S.A. Undertakes And By The Investment Implementation Center Of Pkp Polskie Linie Kolejowe S.A. Decisions Affecting The Possibility Of Implementing Investments In Individual Facilities, And These Circumstances Remain Independent Of The Ordering Party. The Scope Of The Order Will Be Limited At The Stage Of Contract Implementation, Based On A Unilateral Declaration Of The Ordering Party, Without The Need To Obtain The Contractors Consent, And The Contractors Remuneration Will Be Reduced Accordingly In Accordance With The Rules Specified In The Contract. The Deadlines For Carrying Out The Tasks Specified In Annex No. 1 To The Fup May Change Depending On The Implementation Of The Renovation Deadlines By The Railway Lines Plant Of Pkp Polskie Linie Kolejowe S.A. And Implementation Of Projects By The Investment Implementation Center Of Pkp Polskie Linie Kolejowe S.A. The Ordering Party Will Keep The Contractor Informed About Changes In This Respect. For 20% Of Railway Stops, It Is Possible To Change The Expected Number Of Devices, In Accordance With The Requirements Of Area Managers. Basic Tasks Of The Contractor: 1) Design Based On Existing And Made Available Designs By Cri - Polskie Koleje Państwowe S.A. Investment Implementation Center Northern Region And Construction Of A Power Supply, 2) Construction And Reconstruction Of Electrical Switchboards, 3) Where Applicable: Earthworks, Leveling, Supplementary Hardening Of The Surface, Construction Of A Surface Layer Around Validating Devices, Reconstruction Works. 4) Participation In Local And External Authors Meetings And Supervisions For All Locations Covered By The Subject Of The Order, If Necessary, 5) Execution Or Acquisition Within The Offer Price, Necessary For The Proper Implementation Of The Subject Of The Order And Incurring The Costs Of: Arrangements, Opinions, Decisions, Analyses, Research, Permits, Supervision, All Committees, Etc., Necessary To Develop Design Documentation And Build Electricity Supply For Validating Devices, Obtain The Necessary Opinions Of Authorities, Construction Acceptance, Permits, Approval Of The Project By The Traffic Management Authority, Measurements, Tests And Checks That Are Necessary To Perform The Subject Of The Order, Other Studies, Works And Tests Required By The Design And Executive Documentation, Purchase Of Maps For Design Purposes,
|