|
Sinapi-I 2707-Full Construction Civil Engineer (Hourly), General Works Supervisor (Monthly Payer), 103689Sinapisupply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, 99059-Sinapi Conventional Location Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses-Af-03/2024, Mobilization And Demobilization Of Percussion Survey Equipment With Standard Penetration Test (Spt) (Fixed Cost), Survey A Percussion With Standard Penetration Test (Spt), Diameter 2.1/2, Exclusive Mobilization And Demobilization, Rental Of Container 2, 30 Container, Including Loading, Unloading And Transport In Truck With Crane (Munck), Exclusive Container Rental, Temporary Water And Sewage Connection, Temporary Electricity Connection For Container, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placement Of Formwork). Af_01/2024, Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020, Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024, Manufacture, Assembly And Disassembly Of Shoe Formwork, Made From Resin Plywood Sheet, E=17 Mm, 4 Uses. Af_01/2024, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024(2), Concreting Footing, Fck 20 Mpa, Using Jerica - Laying, Densifying And Finishing, Manual Backfilling Of Trenches, With Percussion Soil Compactor. Af_08/2023, Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Thickness 5 Cm. Af_01/2024(2), Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, 3 Mm - Assembly. Af_01/2024(2), Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Densification And Finishing., With Percussion Soil Compactor. Af_08/2023(2), Chapisco Applied To Masonry And Internal Concrete Structures, Using A Trowel. Mortar Mix 1:3 Prepared In A 400L Concrete Mixer. Af_10/2022, Surface Waterproofing With Cement Mortar And Sand, With Waterproofing Additive, E = 1.5Cm. Af_09/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 8 Uses. Af_09/2020, Assembly And Disassembly Of Beam Formwork, Without Propping, Made Of Resin Wood Sheet, 8 Uses., Propping With Wooden Fork, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 8 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Structure D
|