1. The Subject Of The Order Is The Construction Of A Recreational Zone In The Area Of Ul. Naruszewicza In Kielce.2. The Subject Of The Order Was Divided Into Stages (Stage I And Ii) And Includes In Particular: 2.1. In The Scope Of Stage I: 1) Development Of Design Documentation Based On The Functional And Utility Program (Ffu), Constituting Annex No. 5 To The Swz, And Applicable Regulations, Enabling The Notification Of The Intention To Perform Construction Works; 2) Obtaining, At Your Own Expense, Maps, Arrangements, Opinions, Tests And Checks Of The Design Documentation Necessary And Required By Law, Necessary To Develop Complete Design Documentation, Enabling The Notification Of The Intention To Perform Construction Works;2.2. Within The Scope Of Stage Ii: 1) Delivery And Assembly Of Play Equipment, Maintaining Appropriate Safe Zones And Elements Of Small Architecture In Accordance With The Planned Scope And In Accordance With The Approved Design, In Particular: A) Play Set (1 Pc), B) Sandbox (1 Pc), C) Regulations For The Use Of The Playground/Information Board (1 Pc), D) 1-Person Spring Bouncer - Various Animals (Min. 2 Pcs), E) Single Swing Swing With Storks Nest Seat (Min. 1 Pc.), F) Double Swing Swing (Min. 1 Pc.), G) Rocking Park Bench (Swing Bench) (Min. 2 Pcs.), H) Double Weighing Swing (Min. 1 Pc.), I) 4-Compartment Waste Segregation Bin (Min. 1 Pc.), J) Benches With Backrest And Armrests (Min. 6 Pcs.), K) Dog Waste Bin (Min. 1 Pc.), L) Bicycle Stand, Min. 3 Stations (Min. 1 Pc), 2) Hardening Under The Bench With Swings Made Of Concrete Cubes; 3) Construction Of A Fence For The Playground; 4) Replacement Of The Existing Sidewalk And Construction Of A New Communication Route; 5) Construction Of A Safe Surface In The Form Of Hypertrophic Mats; 6) Planting; 7) Restoration Of The Surface After Construction Works, Including: Leveling, Topsoiling And Grassing; 8) Tidying Up The Area; 9) Securing The Greenery Existing During The Works; 10) Any Other Works That Prove Necessary For The Execution Of The Subject Of The Order; 11) Carrying Out An As-Built Geodetic Inventory And Developing As-Built Documentation; 12) Obtaining The Required Certificates From The Inspection Of The Completed Land Development, Confirming Its Compliance With The Standards, Carried Out By A Safety Specialist Or Another Accredited Unit.3. The Detailed Scope And Method Of Execution Of The Order In The Scope Of Stages I And Ii Are Determined By: 3.1. Functional And Operational Program - Constituting Annex No. 5 To The Swz, 3.2. Contract Template - Constituting Annex No. 6 To The Swz.
Contact Information
Address
Gmina Kielce,Kielce,25-303,Świętokrzyskie,Pl721 - Kielecki
Email
zamowienia.bzp@um.kielce.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113632232
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.