|
The Subject Of The Order Is The Construction Of A Sports Facilities Building In The Wojkowice Sports Park Along With A Full-Size Training Pitch. The Task Was Carried Out In The Design And Build Formula. The Scope Of Work To Be Performed As Part Of The Investment Has Been Divided Into Two Zones: Zone A - Sports Facilities: 1) Demolition Of The Existing Sports Facility And Guardhouse (Basement, Ground Floor, First Floor) 2) Construction Of A New Sports Facility (Ground Floor, First Floor) 3) Construction Of A New One With Reconstruction Of The Existing Technical Infrastructure (External Sanitary, Electrical, Low-Voltage Installations) 4) Construction Of Road Infrastructure And Greenery, Including: Square, Sidewalks, Greenery Zone A Intended For The Location Of A Two-Story Facilitya) Ground Floor Intended For The Following Functions: - Entrance Hall With Lobby And Reception, - Office Room, - Staircase, - Lecture Room For Approx. 30 People, - Technical Rooms, - Trainers Rooms, - Judges Rooms, - Sauna, - Administration Room, - Communication, - Vestibule, - Toilets, - Hosts Locker Room, - Guests Locker Room, - Juniors Locker Room 1,- Junior Locker Room 2, - Warehouse, - Public Toiletsb) First Floor With A Room For The Following Functions: - Office Rooms From 1-5 - Staircase - Kitchenette Zone B - Full-Size Training Pitch: 1) Construction Of A Full-Size Training Pitch 2) Construction Of Technical Infrastructure Related To The Drainage Of The Pitch (Rainwater And Electrical Installations, Drainage, Rainwater Tank, Connection To A Watercourse) 3) Construction Of Infrastructure Technical Related To The Equipment Of The Pitch (Demolition Of The Existing Fence, Construction Of A New Fence, Construction Of Sports Stands, Construction Of Ball Catches). In Zone B, A Training Pitch With An Artificial Grass Surface Is Planned, Along With Technical Infrastructure In The Form Of Pitch Drainage And Rainwater Drainage. Additionally, It Is Planned To Dismantle The Existing Fence On The Northern Side And Build A New Fence, As Well As Construction Of 6-Meter Ball Catches Behind The Goals And Sports Stands. Investment Location For The Construction Of A Sports Facility (Zone A): Plot No. 1550/11, 1550/13, 1550/29, 1551/1, 1551/6. Location Of The Investment For The Construction Of A Sports Field (Zone B): Plot No. 1551/4, 1555/1, 1555/2 The Scope Of Work As Part Of The Investment Includes In Particular: - Demolition Of The Existing Building Along With The Performance Of All Formal And Legal Activities Necessary To Carry Out The Demolition, Including Obtaining The Required Arrangements, Opinions, Permits Or Notifications, In Accordance With Applicable Law. - Preparation Of A Construction Design And Obtaining For It The Following Regulations: Opinions, Arrangements And Permits Together With A Building Permit, - Preparation Of Technical Designs, - Surveying Services, - Performance Of Construction And Assembly Works Based On The Above Designs, - Delivery Of Devices And Install
|