1. Subject Matter Of The Order.1.1 The Subject Of The Order Is The Performance Of Mining Works Consisting In Securing Chamber Viii/15 (The Switchboard Chamber Of The Main Pumping Station) In The Underground Part Of The Wieliczka Salt Mine Plant, Hereinafter Referred To As Mining Works.1.2 The Purpose Of The Mining Works Is To Restore The Operational Safety Standards Of The Vehicle Transformer Station And The 3 Kv Mv Electrical Switchgear Serving Unsaturated Water Pumps Located In The Chamber Viii/15.2. Scope Of Mining Works As Part Of The Execution Of Mining Works, The Contractor Is Obliged To: 1) Organize The Work Site (Area), 2) Prepare The Technology For Carrying Out The Works, 3) Provide Materials Necessary To Carry Out Mining Works, 4) Provide Machines And Devices Necessary To Carry Out Mining Works, 5) Provide Persons With Appropriate Authorizations And Qualifications To Supervise The Mining Works, 6) Provide Surveying Services, 7) Carry Out Mining Works.3. Work Execution Technology3.1 Before Commencing Work In The Underground Workings Of The Wieliczka Salt Mine, The Contractor Is Obliged To Prepare The Technology Of Their Execution, Agree It With The Services Subordinated To The Operations Manager Of The Wieliczka Salt Mine (Hereinafter Referred To As Krzg), And Then, After Agreeing, Submit It For Approval To Krzg. The Technology Should Be Consistent With The Order Of Krzg No. Ksw/Z/Krzg/42/2018 Of April 24, 2018, Constituting Annex No. 1 To The Contract Template.3.2 The Technology Should Be Developed In Writing In Three Copies And One Copy In Electronic Form And Submitted For Approval Within 21 Days From The Date Of Conclusion Of The Contract.3.3 Krzg Is Obliged To Approve The Technology Within 3 Days Working Days, Counting From The Date Of Receipt Of The Agreed Technology From The Contractor, Subject To The Provisions Of Point 3.4.3.4 The Contractor Is Obliged To Make Changes To The Technology Of Performing Works If Krzg Submits Comments Within 3 Business Days. The Deadline Referred To In Point 3.3, Runs Anew From The Date Of Delivery Of The Changed Work Technology To Krzg.4. Execution Of Mining Works4.1 Mining Works Should Be Carried Out In Accordance With: 1) Design Documentation Entitled: Update Of The Design For The Reconstruction And Protection Of The Excavation In Which The 3Kv Mv Switchgear Is Located (The Walkway From Chamber Viii/15 Towards The Kościuszko Shaft Located On Level Viii Of The Wieliczka Salt Mine), Constituting Annex No. 3 To The Contract Template, 2) With Permission No. 9/26 Of The Conservator Monuments Of The Krakow Saltworks Of April 8, 2026, Reference Number: Dk-453-10/26, Constituting Annex No. 4 To The Contract Template, 3) Instructions For Fire-Retardant Impregnation Of Wooden Casing Elements And Decoration Of Workings In K.S. Wieliczka S.A. For Inflammable Material, Constituting Annex No. 5 To The Contract Template,4) Instructions For Safe Dressing Of Ceilings And Side Walls In Underground Corridor And Chamb
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113632121
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.