4.1. The Subject Of The Order Is The Execution Of Construction Works, Including The Renovation And Modernization Of Some Rooms Of The Existing Building Of The Integration Kindergarten No. 1 In Łuków In Connection With The Needs Of Disabled People In The Scope Of: 4.1.2. Demolition And Dismantling Works: 1) Steel Balustrades And Handrails With Wooden Handrails On The Main Staircase, 2) Wooden Radiator Covers, Panel Radiators And Curtain Rods, 3) Electrical Equipment (Lighting Fixtures, Switches And Plug Sockets), 4) Door Leaves And Carving 5 Wooden Door Frames Out Of The Wall 5) Door Leaves And Carving Them Out Of Wall, Steel Door Frames In The Amount Of 1 Pc.6) Window Sashes And Frames Of Service Windows With A Wooden Structure (2 Pcs.)7) Ventilation Grilles In The Amount Of 25 Pcs.8) Pvc And Wooden Skirting Boards,9) Plastic Carpets And Pvc Floor Coverings In The Rooms. No. 0/3, 0/5, 0/6, 0/7, 0/8,10) Wood-Based Floor Panels In The Room. No. 0/4, 11) Floors Made Of Slats With Detached Wooden Plinth Strips, 12) Reflecting Of Internal Plasters With Strips Of Local Scalds And Defects Resulting From The Dismantling Of Wooden Plinth Strips, 13) Reflecting Of Deaf And Scalded Plasters With Ce. – Vape. On The Walls In The Amount Of Approx. 15% Of The Wall Surface In The Room. No. 0/3, 0/5, 0/7,14) Removing Scalded Concrete Floor Surfaces In The Amount Of Approx. 20% Of The Floor Area In The Room. No. 0/3, 0/5, 0/7.15) Widening The Opening To A Width Of 102 Cm, I.E. By 7 Cm In The Plasterboard Wall, Taking Into Account The Necessary Dismantling Of The Double-Sided Plasterboard Cladding And The Door Frame Profile, And Inserting A New Steel Door Frame Profile Type Ua 75.16) Widening The Opening To A Width Of 102 Cm, I.E. By 10 Cm In The Partition Wall Brick With A Total Thickness Of 15 Cm, Taking Into Account The Necessary Demolition Of The Wall And The Existing Lintel, Chiseling Out Shreds To Fill A New Prefabricated Concrete Lintel Type L-19, 130 Cm Long, 17) Removing The Layer Of Subit Adhesive (A Carcinogenic Product) From Concrete Substrates After The Dismantled Parquet Boards, In A Dust-Free Manner Using Specialized Removal And Cleaning Equipment Adhesive Substrates, Unevenness In The Room. No. 0/3, 0/5, 0/7.18) Leveling And Mechanical Cleaning Of Concrete Substrates For Pvc Floor Coverings In The Rooms. No. From 0/3, 0/4, 0/5, 0/6, 0/7, 0/8, 19) Cutting Off The Terrazzo Cladding From The Stairs (Runs And Landings As Well As Plinths And Flight Faces) In Room No. 0/9, 20) Removing Rubble And Waste From The Building, Removing It And Disposing Of It, 21) Disposal Of Materials Containing Subit Adhesive Residues (Slats) Parquet) As Well As Flexible Pvc And Carpet Flooring As Well As Joinery And Electrical Equipment,4.1.2. Plastering And Accompanying Works, Including: 1) Local Repair Plasters In Places Of Burnt Plaster In The Amount Of Up To 15% Of The Wall Surface (Rooms No. 0/3, 0/5, 0/7) And After Damage Resulting From The Disassembly Of Skirting Board
|