|
1. The Subject Of The Order Is The Construction Of A Photovoltaic Installation With A Heat Pump And Attic Insulation In The Kamil Ii Care And Education Facility In Kodręba By Construction, Assembly And Commissioning Of A Photovoltaic Installation With A Power Of 16.17 Kwp, Consisting Of 33 Photovoltaic Modules With A Power Of 490Wp Each, Replacement Of The Heat Source From An Eco-Pea Coal Fired Boiler With Air/Water Heat Pumps, Installation Energy Storage, Replacement Of Windows And Doors, Thermal Insulation, Modernization Of The Central Heating Installation, Led Lighting And Other Accompanying Works. The Subject Of The Order Is Co-Financed By The Provincial Fund For Environmental Protection And Water Management In Łódź.1.1. The Execution Of The Subject Of The Order Includes In Particular The Following Scope Of Work: 1.1.1. Construction Industry Works: - Making Steel Door Frames And Doors Out Of The Wall, - Making Internal Window Sills Out Of The Wall, - Dismantling Floors, - Leveling The Difference In Floor Levels, - Insulating The Floor With Polystyrene, - Making Floor Insulation, - Making A Floor With Stoneware Tiles And Floor Panels, - Making A Staircase Cover With Vinyl Panels, - Making Partition Walls With Plasterboards, - Making Walls With Plasterboards Arrangement (Pouffes And Riser Structures), - Installation Of Pouffes, - Plastering Of Plastered Walls, Ceilings And Door Frames, - Painting With Latex Paints, - Installation Of Thermal And Anti-Sound Insulation With Mineral Wool, - Installation Of A Ceiling Hatch, - Installation Of A Suspended Ceiling From Gkf Boards, - Installation Of Door Frames And Doors, - Installation Of Windows, - Adjustment Of Windows And Doors, - Installation Of Internal Window Sills, - Cleaning Works, Including Supplying The Facility With Fire Extinguishers.1.1.2. Sanitary Industry Works: - Dismantling Works Of Existing Finned Radiators And The Boiler As Well As Installations Within The Boiler Room/Basement, - Installation Of Radiator Valves, - Installation Of Bottom-Fed Steel Panel Radiators, - Installation Of Underfloor Heating, - Installation Of Air/Water Heat Pumps With Valves, - Installation Of A Buffer, Domestic Hot Water Tank, Expansion Vessel, Pipelines And Constant Flow Regulators, - Changing The Routing Of Ventilation Ducts On Attic, - Tightness Tests Of The Central Heating Installation, - Commissioning Of The Installed Ventilation System Along With Adjustments, Tests And Acceptance. 1.1.3. Works In The Electrical Industry: - Installation Of Led Lighting, - Installation Of General-Purpose Plug Sockets, - Installation Of Lighting Fixtures In Suspended Ceilings, - Installation Of Grounding And Lightning Protection Installations, - Installation Of Rl Protective Pipes, - Construction Of Rp And Rk Switchboards - Construction Of A Photovoltaic Installation With A Capacity Of 16.17 Kwp - Purchase And Installation Of 490Wp Photovoltaic Modules, - Purchase And Installation Of A Hybrid Photovoltaic Inverter, - Pur
|