3.2. The Subject Of The Construction Project Is Modernization And Renovation Works In The Building Of The Municipal Office In Tuchola, Located On Plot No. 676.1) The Scope Of The Task Includes The Renovation Of The Existing Office Room Located On The Ground Floor And Its Reconstruction For The Needs Of A Delivery Office, Ensuring Access For Disabled People Through The Designed (Additional) Delivery Counter With A Maximum Height Of 90 Cm. The Space Of The Currently Functioning Administration Office Will Be Transformed Into A Utility Room.2) The Scope Of Work Also Includes The Renovation Of Womens And Mens Toilets On The Ground Floor And On The First Floor. Planned Works: 1. Place Of The Existing Delivery Office: – Disassembly Of The Existing Delivery Window Together With The Existing Buildings, – Installation Of A Plasterboard Wall And Installation Of An Information Board (The Board Is Provided By The Ordering Party), – Power Supply And Installation Of Information Board Lighting.2. Womens Toilets And Mens Toilets (Ground Floor + First Floor): - Demolition Of The Indicated Partition Walls, - Dismantling Of The Existing Suspended Ceiling, - Removing Existing Floor And Wall Tiles, - Dismantling Of Existing Sockets, Lighting Fixtures And Connectors, - Dismantling Of Existing Sanitary Utensils, - Building New Partition Walls Thick. 8 Cm, – Reconstruction Of The Water And Sewage Installation, – Reconstruction Of The Electrical Energy Installation – Supplying Power To The Planned Points, – Installation Of An Illuminated Mirror With A Heating Mat, – Laying A New Floor Made Of Stoneware Tiles And Stoneware Tiles On The Walls To The Entire Height Of The Room, – Installation Of Hpl Walls To The Entire Height Of The Room Along With Door Leaves, – Installation Of A Suspended Ceiling On A Metal Frame, – Installation Of New Sanitary Utensils In The Indicated Areas Places (Toilet Bowls, Urinals, Washbasins, Floor Drains), – Reconstruction Of Ventilation (New Ventilation Grilles, Window Vents, Flow Stabilizer, Hybrid Chimney Pots), – Installation Of Lighting Fixtures, Sockets And Connectors.3. Serving Office/Serving Counter: – Dismantling Of The Existing Steel Panel Radiator In The Main Hall, – Partial Demolition Of The Wall (Opening) Between The Main Hall And The Planned Serving Office (Demolition From A Height Of 90 Cm And 120 Cm To The Height Of The Designed Beam H = 265 Cm), – Installation Of A 3Xipe180 Steel Beam In Accordance With The Drawing, – In The Event Of A Collision Of Existing Installation Elements Fire Protection Existing Elements Should Be Moved With The Designed Beam, - Dismantling The Existing Floor Made Of Floor Panels, - Dismantling The Existing Sockets, Lighting Fixtures And Connectors, - Reconstruction Of The Electrical Installation - Supplying Power To The Planned Points, - Laying A New Floor Made Of Floor Panels In The Room. Serving Office, – Construction Of The Serving Counter, – Installation Of The Serving Counter Glazing, – Installation
|