Tender for Supply Installation Testing and Commissioning of Data Center Infrastructure At Cial. , Precision Air Conditioning System (13 Tr) At Data Centre 2 (Terminal 3) , Supply Of Pac( 13 Tr) As Per Tender Spec , Itc Of Pac( 13 Tr) As Per Tender Spec , Supply Of Lowside Works For Pac( 13 Tr) , Itc Of Lowside Works For Pac( 13 Tr) , Dismantling Of Existing Pacs, Including Outdoor Units , Precision Air Conditioning System (6 Tr) At Dr (Atc Building) , Supply Of Pac( 6 Tr) As Per Tender Spec , Itc Of Pac( 6 Tr) As Per Tender Spec , Supply Of Lowside Works For Pac( 6 Tr) , Itc Of Lowside Works For Pac( 6 Tr) , Dismantling Of Existing Pacs, Including Outdoor Units , Intelligent Power Distribution Unit(Ipdu) , Supply Of Ipdu As Per Tender Spec , Itc Of Ipdu As Per Tender Spec , Equipment Rack And Tap-Off Boxes , Supply Installation Testing and Commissioning of Equipment Rack (42 U) , Supply Installation Testing and Commissioning of Tap-Off Boxes , Very Early Smoke Detection Apparatus(Vesda) System In A Data Centres , Supply Of Vesda System For Dc 1 & Dc 2 , Itc Of Vesda System For Dc 1 & Dc 2 , Supply Of Vesda System For Dr , Itc Of Vesda System For Dr , Water Leak Detection System In A Data Centres , Supply Of Water Leak Detection System For Dc 1 & Dc 2 , Itc Of Water Leak Detection Systemfor Dc 1 & Dc 2 , Supply Of Water Leak Detection System For Dr , Itc Of Water Leak Detection System For Dr , Air Purification System In A Data Centres , Supply Of Air Purification System For Dc 1, Dc 2 & Dr , Itc Of Air Purification System , Data Centre Infrastructure Management (Dcim) System , Supply Of Dcim Hardware , Itc Of Dcim Hardware , Supply Of Dcim Software , Itc Of Dcim Software , Supply Installation Testing and Commissioning of Monitoring Nodes With License , Fire Alarm & Suppression Systems For Dc 1 & Dc 2 , Supply Installation Testing and Commissioning of Gas Release Panel , Supply Installation Testing and Commissioning of Cylinder(80 Litre) , Supply Installation Testing and Commissioning of Clean Agent , Supply Installation Testing and Commissioning of Master Multi Cylinder Kit , Supply Installation Testing and Commissioning of Slave Cylinder Kit , Supply Installation Testing and Commissioning of Manifold Assembly , Supply Installation Testing and Commissioning of Non-Return Valves (Nrvs) , Supply Installation Testing and Commissioning of Pressure Switch , Supply Installation Testing and Commissioning of Abort Switch , Supply Installation Testing and Commissioning of Manual Release Switch , Supply Installation Testing and Commissioning of Conventional Multi Detector , Supply Installation Testing and Commissioning of Response Indicator , Supply Installation Testing and Commissioning of Hooter Cum Strobe , Supply Installation Testing and Commissioning of Copper Armoured Cable , Supply Installation Testing and Commissioning of Cylinder Strap , Miscellaneous Items(Like Sign Stickers, Packing Charges & Modification Of Existing Of Ms Seamless Pipe) , Fire Alarm & Suppression Systems For Dr , Supply Installation Testing and Commissioning of Gas Release Panel , Supply Installation Testing and Commissioning of Cylinder(80 Litre) , Supply Installation Testing and Commissioning of Clean Agent , Supply Installation Testing and Commissioning of Master Multi Cylinder Kit , Supply Installation Testing and Commissioning of Slave Cylinder Kit , Supply Installation Testing and Commissioning of Manifold Assembly , Supply Installation Testing and Commissioning of Non-Return Valves (Nrvs) , Supply Installation Testing and Commissioning of Pressure Switch , Supply Installation Testing and Commissioning of Abort Switch , Supply Installation Testing and Commissioning of Manual Release Switch , Supply Installation Testing and Commissioning of Conventional Multi Detector , Supply Installation Testing and Commissioning of Response Indicator , Supply Installation Testing and Commissioning of Hooter Cum Strobe , Supply Installation Testing and Commissioning of Copper Armoured Cable , Supply Installation Testing and Commissioning of Cylinder Strap , Miscellaneous Items(Like Sign Stickers, Packing Charges & Modification Of Existing Of Ms Seamless Pipe) , Buy Back Of Existing Pacs And Fire Suppression System At Dc 2 And Dr. , Comprehensive Annual Maintenance Contract For 2 Years, Inclusive Of Spares And Accessories. annual maintenance contract Starts After The Warranty Period Of 5 Year. All Amounts In Rs Are Inclusive Of All Taxes, Levies, Transportation, Etc. , 1St Year Manpower Charges , 2Nd Year Manpower Charges , 3Rd Year Manpower Charges , 4Th Year Manpower Charges , 5Th Year Manpower Charges , 6Th Year Manpower Charges , 7Th Year Manpower Charges , 1St Year Maintenance Charges , 2Nd Year Maintenance Charges , 3Rd Year Maintenance Charges , 4Th Year Maintenance Charges , 5Th Year Maintenance Charges , 6Th Year Camc , 7Th Year Camc
|