|
Reconstruction Of Bridge Structures Along The District Road No. 1926C Nakło-Bydgoszcz In The Town Of Wystaw Km (Paramelka And The Bydgoszcz Canal). As Part Of The Planned Reconstruction, The Following Works Are Expected To Be Performed: Surface - Reconstruction Of The Surface On The Facility By Removing The Existing One And Constructing A New One, - Reprofiling Of The Gradeline And Transverse Slopes On The Facility, - Connecting The Designed Surface Slopes To The Slopes Existing On The Access Roads To The Facility, Steel Structure - Abrasive Blast Cleaning Of The Steel Structure Of Spans, Main Girders And Crossbars From Coating Residues Anti-Corrosion, - Restoration Of Anti-Corrosion Protection On Steel Elements, - Construction And Replacement Of Extreme Steel Crossbars, - Concrete Surfaces - Disassembly Of Existing Caps And Their Reconstruction, - Abrasive Blast Cleaning Of Concrete Surfaces From The Remains Of Protective Coatings And Loose Fragments Of The Cover, - Mechanical Removal Of Degraded Cover Of Reinforcing Bars, Cleaning Them From Corrosion Products And Securing Them Anti-Corrosion, - Restoration Of The Geometry And Standard Cover Thickness Of The Reinforcement Bars In The Concrete Surface Repair Technology, - Removal Of The Corroded Layer Of The Bridge Slab And Construction Of A New Layer Of Concrete, Adjustment Of The Geometry Of The Slab To The Designed Corrected Road Grade On The Facility, - Implementation Of New Coatings To Protect Concrete Surfaces, - Removal Of The Upper Part Of The Abutment Wing To Make A New Cap, Bearings - Replacement Of Existing Bearings Steel, Drainage And Insulation - Replacement Of Existing Bridge Inlets, - Construction Of Curb Sewage, - Reconstruction Of The Insulation Of The Platform Slab, - Construction Of A Drainage Collector, Expansion Joint - Reconstruction Of Bituminous Expansion Joints, Area Around The Facility, Markings, Others - Removal Of Existing Balustrades And Construction Of New Barriers And Handrails, - Tidying Up And Cleaning The Area Around The Facility, - Cleaning Of The Stone Reinforcement Of The Slope Cones And Area Reinforcements, Supplementing/Replacing Missing/Damaged Elements And Completing The Grouting, - Cleaning Of The Slope Stairs, Making A Height Connection To The Designed Road Grade, - Replacing The Navigation Markings On The Facility, - Making New Curbs, A Detailed Description Of The Subject Of The Order And The Scope Of Works Is Included In The Design Documentation, Bill Of Quantities, Calculation Tables, Technical Specifications Of The Execution And Acceptance Of Construction Works And Offer Cost Estimate.
|