|
1. The Subject Of The Order Is: Creation Of A Municipal Warehouse Of Civil Protection Resources In Sicienko By Modernization Of Existing Municipal Facilities. The Subject Of The Task Is The Modernization Of Existing Municipal Facilities On Plots No. 169/18 And 169/19 In Sicienko. The Scope Of Work Is Specified In This Description And In The Design Documentation Constituting Annex No. 6 To The Swz.1) Scope Of Work: - Preparatory And Security Works Consisting In Organizing The Construction Site, Securing The Work Area, Making The Necessary Fencing And Securing The Existing Technical Infrastructure Located In The Investment Area; - Demolition Works Including Dismantling Existing Floors, Window And Door Joinery, Warehouse Doors, Sheet Metal Flashings, Gutters And Pipes Drains, Roof Covering To The Extent Provided For In The Design Documentation, Parts Of Partition Walls And Existing Electrical And Lightning Protection Installations; Modernization Of Warehouse Building No. 1, Including Reinforcement Of Structural Elements And Curtain Walls, Making New Holes For The Installation Of Sectional Gates, Bricking Up Some Window Openings, Construction Of New Floors, And Repair And Reconstruction Of Damaged Building Elements In Accordance With The Design Documentation; Thermal Modernization Of Warehouse Building No. 1, Including Thermal Insulation Of External Walls Using The Method Light-Wet Using Eps Styrofoam 70 Gr. 10 Cm, Making Facade Plasters Of Thin-Layer Mineral Plaster Painted With Silicate Paint, Roof Insulation With Thick Polystyrene. 10 Cm, Including The Installation Of A New Roof Covering With Underlay And Surface Felt, Replacement Of Windows And Doors, Installation Of New Sectional Gates, Sheet Metal Flashings, Gutters And Downpipes; - Heating Of Selected Rooms Of The Warehouse Building No. 1 Intended For Storing Materials Sensitive To Low Temperature. Electric Heaters Equipped With Thermostats, Thermostatic Valves And Automation Enabling The Maintenance Of A Minimum Temperature Of +5°C Should Be Installed; Modernization Of The Warehouse Building No. 2, Including Reinforcement Of Structural Elements And Curtain Walls, Demolition And Construction Of New Floors, Leveling Of Floor Levels Between Rooms, Removal Of The Existing Ramp And Removal Of The Existing Fanlight, Along With Filling The Opening With A Pir Sandwich Panel. 10 Cm; Thermal Modernization Of Warehouse Building No. 2, Including Insulation Of External Walls Using The Light-Wet Method Using Eps 70 Gr. 15 Cm, Making New Facade Plasters, Insulating The Roof With Styrofoam Thick. 10 Cm, Including The Installation Of A New Roof Covering, Replacement Of Window And Door Joinery, Replacement Of Warehouse Doors, Window Sills, Sheet Metal Flashings, Gutters And Downspouts; - Implementation Of New Electrical Installations In Both Buildings In Accordance With The Design Documentation, Along With The Installation Of Electrical Equipment, Lighting Fixtures And Performance Of The Required Measurements
|