|
Reform And Expansion Of Cras. - Work Sign In Galvanized Steel Sheet (3.00M*1.50M), Renovation And Expansion Of The Cras. - Location Of Work, Renovation And Expansion Of Cras. - Junior Construction Civil Engineer With Additional Charges, Reform And Expansion Of Cras. - Mechanized Trench Excavation With Prof. Greater Than 4.5 M Up To 6.0 M (Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. Less Than 1.5 M, On 1St Category Soil, In Places With A High Level Of Interference. Af_09/2024, Reform And Expansion Of Cras. - Truck For Suction Cleaning Equipment With Truck Of Total Gross Weight 23000 Kg, Max Payload 15935 Kg, Wheelbase 4.80 M, Power 230 Hp, Including Suction Cleaner, Tank 12000 L - Materials In Operation. Af_05/2023, Reform And Expansion Of Cras. - Demolition Of Masonry For Any Type Of Block, Mechanized, Without Reuse. Af_09/2023, Reform And Expansion Of Cras. - Mechanized Trench Landfill With Hydraulic Excavator (Bucket Capacity: 0.8 M/Power: 111 Hp), Width Up To 2, Depth 3.0 To 6.0 M, With Clay-Sandy Soil. Af_08/2023, Reform And Expansion Of Cras. - Execution And Compaction Of Landfill Embankment Body (95% Of Normal Proctor Energy) With Predominantly Clayey Soil, In Layers 20 Cm Thick - Excluding Excavation, Loading And Transport And Soil. Af_09/2024, Reform And Expansion Of Cras. - Manual Excavation For Crowning Block Or Footing (Including Excavation For Formwork). Af_01/2024, Reform And Expansion Of Cras. - Manufacture, Assembly And Disassembly Of Formwork For Running Shoes, In Sawn Wood, E=25 Mm, 2 Uses. Af_01/2024, Reform And Expansion Of Cras. - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Reform And Expansion Of Cras. - Concreting Of Footing, Fck 30 Mpa, Using Jerica - Laying, Densification And Finishing. Af_01/2024, Reform And Expansion Of Cras. - Manual Excavation For Baldrame Beam Or Running Shoe (Including Excavation For Placing Formwork). Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, 1 Use. Af_01/2024, Reform And Expansion Of Cras. - Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Reform And Expansion Of Cras. - Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Reform And Expansion Of Cras. - Concreting Of The Crowning Block Or Baldrame Beam, Renovation And Expansion Of The Cras. - Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Reform And Expansion Of Cras. - Stone Mortared With Cement And Sand 1:3, 40% Mortar By Volume - Commercial Sand And Stone - Supply And Laying. Af_08/2022, Reform And Expansion Of Cras. - Manufacture Of Formwork For Pillars And Similar Structures, E=25 Mm. Af_09/2020, Reform And Expansion Of Cras. - Manufacture Of Formwork For Beams, With Sawn Wood, E = 25 Mm. Af_09/2020, Reform And Expansion Of Cras. - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022, Reform And Expansion Of Cras. - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 8 Steel, Renovation And Expansion Of Cras. - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5 Ca-60 Steel, Renovation And Expansion Of Cras. - Concreting Of Pillars, Fck = 25 Mpa, Using Buckets - Launching, A
|