Structural Shell Work – Urban Expansion. Business School For The Integration Of The State. Fos - Master Builder Work. General Services: - Construction Site Facility Plan, Documentation, Sampling Construction Site Equipment: - Office, Meeting, Lounge And Sanitary Containers 1 Piece Each - Staircase With Temporary Bridge: 1 Piece - Chemical Toilet: 3 Pieces - Construction Fence 111M, Temporary Barrier Gate: 75M - Surveying Earthworks: Incl. Explosive Ordnance Support - Excavation: Approx. 1390M2 - Planum Creation: Approx. 2200M2 - Installation: Approx. 960M2 - Disposal Of Polluted Substances: Approx. 2500T - Filler For Be Area: Approx. 540M2 - Control Tests Substructure Planum/Base Layer: 8 Pieces - Provisional Dewatering Measure Incl. Pump Sump, Top Basin: 5 Pieces. Special Foundation Engineering Work Including Explosive Ordnance Support: - Bored Pile Foundation Drilling: Approx. 940M - Bored Pile Foundation Piles: Approx. 930M Concrete And Reinforced Concrete Work - Cleanliness Layers: Approx. 740M2 - Walls In In-Situ Concrete Sb2/Sb3: Approx. 1070M3 - Strip Foundations: Approx. 110M3 - Individual Foundations: 1M3 - Floor Slabs/Coves Concrete: Approx. 730M3 - In-Situ Concrete Columns Rectangular/Round: Approx. 3M2 Sealing And Insulation Work: - Temporary Sealing: Approx. 110M2 - Bituminous Sealing: Approx. 105M2 - Perimeter Insulation Of Base Plate: Approx. 525M2 - Perimeter Insulation Of Strip Foundation: Approx. 305M2 - Base Insulation: Approx. 50M2 - Insulating Wedge: Approx Building Separation Joint: 30M2 Masonry Work Including Plastering Work: - Inner Walls Made Of Block Bricks, Plastered/Tiled On One Or Two Sides: 33M2 - Inner Walls Made Of Bricks, Exposed Brickwork: Approx. 7M2 - Inner Wall Supporting Wall Of Existing Stairs Made Of Block Bricks: Approx. Interior Wall Plaster Gypsum Lime: Approx. 37M2 Demolition Work Including Disposal: - Partial Demolition Of Existing Stairs Including Railings: 1 Piece - Dismantling Of Temporary Existing Stairs: 1 Piece - Partial Demolition Of Floor Structure: 7M2 - Partial Demolition: Drywall: 1 M2 - Partial Demolition: Existing External Wall: 1 Piece Heating Ventilation Sanitary - New Piping Of Approx. 410M Of Basic Pipes Including Creation Of The Necessary Pipe Trench - Installation Of 7 Shaft Structures - Laying Of Local Heating Including Creation Of The Required Pipe Trench Approx. 25M Including Creation Of A House Connection In New Building And Installation Of A House Entry Bend - Dismantling Work Of 2 Inspection Shafts Dn2000 - Dismantling Of Approx. 130M Of Basic Pipes Made Of Plastic Or Stoneware Up To Dn200 - Dismantling Of The Former Gas Pipe Up To Dn200 Approx. 50M Of Electrical Work: - Be Construction Power Supply With 7 Construction Power Distributors - Low-Voltage Installation System: Pipe Laying In Formwork, Approx. 670M Of Pipe - Lightning Protection/Earthing System, Approx. 370M Of Foundation And Ring Earth - Power Supply For External Systems, Approx. 100M Of Cable Trench
Contact Information
Contact No.
+49 9122860599
Email
vergabestelle@schwabach.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113472626
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.