Task 1: Drainage, Insulation And Insulation Of The Ground Floor Foundations, Gutters And Connection To The Rainwater Drainage System At The Primary School No. 40 At Ul. Zgrzenioka - Segment A. The Subject Of The Order Is The Execution Of Drainage, Insulation And Insulation Of The Ground Floor Foundations, As Well As Gutters And Connection To The Storm Sewage System At The Primary School No. 40 At Ul. Zgrzenioka – Segment A. The Detailed Scope Of Work Is Described In The Design Documentation For Insulation Of Foundations, Drainage, Gutters And Connection To The Rainwater Drainage System Of Segment A Of The School Building, Prepared By The Konspro Design Company Dariusz Obstarczyk Together With Stwior. The Scope Of Work Includes: - Preparatory Works, Including Securing The Work Area, - Demolition Of Existing Surfaces Made Of Paving Slabs And Mineral And Bituminous Surfaces Within The Planned Investment, I.E. Segment A Of The School, - Implementation Of Waterproofing And Thermal Insulation Of Foundation Walls In Segment A Of The School Building, - Execution Of Drainage Around The Foundation Walls Of Segment A Of The School Building With Connection To Existing Sewage Wells, - Laying Of New Roof Gutters And Downpipes On The Side Panels Of The Roof Surface In Segment A Of The School Building Along With Incorporating School Drainage Into The Existing Rain Wells And Those Constructed As Part Of The Investment, - Construction Of New Sidewalk Surfaces And Sidewalk Strips Made Of Concrete Cubes And Terrain Stairs Made Of Conglomerates Stone Works Within The Investment Being Implemented, I.E. Segment A Of The School Building, - Surveying Service Of The Task, - Cleaning Works Including The Disposal Of Demolition Materials. Note The Ordering Party Informs That It Does Not Provide The Bill Of Quantities For The Works. The Design Documentation Constitutes Annex 4 To Swz.1. If Trademarks, Patents Or Origin, Source Or Specific Process That Characterizes Products Or Services Provided By A Specific Contractor Are Indicated In The Order Documents, The Ordering Party Allows The Use Of Materials Equivalent To Those Described.2. If The Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Act, The Ordering Party Allows Solutions Equivalent To Those Described.3. A Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solution He Offers Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches To The Offer Documents Confirming The Equivalence Of The Offered Solutions. The Burden Of Proving Equivalence Rests With The Contractor. The Contractor Shall Demonstrate Equivalence By Any (Reliable) Means. Failure To Demonstrate Equivalence Results In Rejection Of The Offer As Inconsistent With The Terms Of The Order.
Contact Information
Address
Gmina Miasta Tychy,Tychy,43-100,Śląskie,Pl22c - Tyski
Contact No.
327760308
Email
zamowienia@umtychy.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113411697
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.