1. The Subject Of The Order Are Construction Works Consisting In The Modernization Of The Sports Complex Orlik 2012 In Sośnicowice On Plots No. 1002/115, 1965/115, 1533/114, 1534/114, 2617/120, 2619/114 As Part Of The Investment Task Entitled: Modernization Of The Sports Complex Moje Boisko - Orlik 2012 Along With The Construction Of A Long Jump Hill At Ul. Raciborska In Sośnicowice. The Subject Of The Order Includes In Particular:• Modernization Of Pitch Lighting In The Orlik Sports Complex: - Dismantling 24 Existing Fixtures, - Dismantling 24 Existing Booms, - Installing 24 New 192W Led Fixtures, - Installing 24 New Booms, - Replacing Wires In Existing Poles, - Replacing Fuse Plates In Poles, - Modernization Of External Lighting Controls.• Modernization Of Tennis Court Lighting: - Disassembly Of Existing Fixtures, 4 Pcs., - Disassembly Of Existing Booms, 4 Pcs., - Installation Of New 327W Led Luminaires, 8 Pcs., - Installation Of New Booms, 8 Pcs., - Replacement Of Wires In Existing Poles, - Replacement Of Fuse Plates In Poles, - Modernization Of External Lighting Controls.• Renovation Of Toilets: - Removal Door Joinery, - Removal Of Toilet Equipment, - Hammering Tiles On Walls And Floors, - Tiling The Floor With Stoneware Tiles, - Tiling Walls With Ceramic Tiles, - Installation Of Toilet Equipment, - Painting Ceilings, - Delivery And Assembly Of Joinery, - Replacement Of Basic Lighting And Adding Basic Lighting In Indicated Places, - Change Of Lighting Control (Presence Detectors), - Installation Of Emergency Lighting In Indicated Places, - Replacement Of Electrical Installation Equipment - Plug Sockets And Lighting Connectors.• Construction Of A Long Jump Track, 42 M Long And 1.22 M Wide, With A Sandbox Jump With Dimensions Of 2.75X8 M: - Preparatory And Earthworks, - Construction Of The Border Of The Track And The Jump With A Curb, - Construction Of The Substructure For The Runway, - Construction Of A Polyurethane Surface For The Runway, - Construction Of A Sandbox, - Leveling And Tidying Up Area, - Preparation Of A Post-Construction Geodetic Inventory. The Detailed Scope Of Construction Works And Their Type, As Well As Detailed Technical And Material Solutions To Be Used In The Execution Of The Subject Of The Order Are Included In The Design Documentation (Detailed Design Of Lighting Modernization, Detailed Design Of Toilet Renovation And Design Of A Long Jump Track), Technical Specification For The Execution And Acceptance Of Construction Works And Bill Of Quantities, Constituting Annex No. 8 To The Swz. The Bill Of Quantities Is Only An Auxiliary Element When Preparing The Offer, Any Omissions, Underestimations Or Deficiencies Cannot Constitute The Basis For Increasing The Contractors Remuneration. The Basis For The Valuation Of Works Covered By The Order Is The Design Documentation, Stwior, Swz As Well As The Contractors Experience And His Own Calculation.2. As Part Of The Subject Of The Contract, The Contractor Is Obliged To Provide The
|