|
Rental Of Isolation Grid 200 Meters Of Tube Grids For Isolating Areas, Measuring 2X1, 2 Meters Each., Specialized Service In Event Security With A Minimum Of 50 (Fifty) Event Security Agents. People To Supervise The Operation Of Tents, Restrooms, Parking Area, Entrance And Exit To The Event Venue, As Well As Advised On Structural, Patrimonial And Environmental Preservation. Including Food, Transport, Labor Charges, Social Security., Show Bands Show Band With At Least 03 (Three) Local And Regional Musicians, With A Varied Repertoire With Hits In The Styles, Sertanejo, Pagode, Forró, Rock, Axé And Others, With Own Instruments. Minimum Show Duration: 03 (Three) Hours. The Contractor Is Responsible For Food, Accommodation And Shows, Panic And Fire Fighting Panic And Fire Fighting Project And Arts, As Well As Approval From The Fire Department In 3 (Three) Copies, Engineer Responsible To Monitor The Inspection Of The Fire Department Available For The Event. Fire Extinguisher And Warning Signs Necessary To Carry Out The Event Safely., Organization And Production Service For The Darainha Do Arroz Paradeorganization And Production Service For The Parade Of 15 (Fifteen) Candidates For The Queen Of Rice 2026, Comprising:-≫ Coverage And Live Broadcast Of The Party;-≫ Fabrics And Seams (Costumes)-≫ Sandals;-≫ Hairdresser;-≫ Makeup;-≫ Bouquets;-≫ Rehearsals For The Parade;-≫ Stage Ornamentation (Contemplando Tudo)Awards1st Place: R$3,000.00;2Nd Place: R$2,000.00;3Rd Place: R$1,000.00;Participation Prizes: R$300.00 Per Candidate., Professional Voiceover Service Announcer With Experience Preferably With, No Minimum, 5 Years Career., Fireworks90 Mortars Of 1.5 - Height: 70 Meters/Opening: 50Meters18 Mortars Of 1.5 Crackling Trail;18 Mortars Of 1.5 Shaking Trail;18 Mortars Of 1.5 Red;18 Mortars Of 1.5 Green;18 Mortars Of 1, 5 Glitter;36 Mortars 2 - Height: 150 Meters/ Opening: 70 Meters06 Mortars With 2 Crosses Green And Yellow;06 Mortars With 2 Crosses With Blue Pump;06 Mortars With 2 Crosses Green With Silver;06 Mortars With 2 Sparkling Silver;06 Mortars With 2 Chorão;06 Mortars With 2 Flashers;46 Mortars 3/4 - Height: 60 Meters/ Opening: 30 Meters10 Mortars 3/4 Crackling;10 Mortars 3/4 Rotation;10 Mortars 3/4 Shaking;10 Mortars 3/4 Silver;06 Mortars 3/4 Gold;17 Mortars 1.5 Leaf Drought;17 Mortars 1.5 Chorão;17 Mortars 1.5 Kamurro;17 Mortars 1.5 Double Alegria16 Mortars 2 Festive;16 Mortars 2 Cross Of Malta;17 Sparkling Gold Mortars17 Comets Mortars Dourado W/ Blue Tip16 Pink Mortars;16 Lilac Mortars;36 Mortars Of 2 - Height: 100 Meters/Opening 70 Meters;06 Green And Yellow 2 Cross Mortars Party Organization (Including Material)Including-Production:-Work 10 Days Before/During And 05 Days After The Event Composed Of 02 Producers With Fueled Vehicle Available With A Limit To Drive Up To 300Km During The Event Period With Proven Experience Of Working With Renowned/State Artist With Wide Recognition.-Service Of 25 Chargers For Assembly And Disassembly;-Van Service For Land Transfer Of Artis
|