|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Yardcraft Bpt-3 At Nd(Mbi); Emergency Repairs Onboard Bpt-3; Service Provider - For Services Steel Renewal-Aw (With Degutting & Regutting)- 12 Mm And Below With Dpt. Renewal Of Above-Waterline (Aw) Structural Plates (With Stiffeners) Of Thickness Up To 12 Mm Including Degutting Of Lagging. Paneling (Approx 1-2 Clear On All Edges On Both Sides Of The Structure) And Regutting Of Metallic Paneling Material Dmr249a/D40s/Ms/B-Quality Steel Standards Nse-155 , Repair Of Hand Rail , Fitment Of Light Stand Along With Material Od 90 X 2000Mm (Material:Ms) , Repair And Refurbishment Of Reflector Along With Stand. , Repair / Refurbishment Of Mushroom Head (Od 420Mm) , Manufacturing Of Two In No Manhole Door Along With Pad, Drilling And Tapping Welding On Board Fitment Of M16x 50 Mm Qty 16 Each Studs Along With Nut, Fitment Of 5 Mm Thickness Neoprene Gasket And Welding Of Two In No Handle For Door. , Fitment Of New Match And Welding , Removal Of Da Room Soft Batch, Straightening Align And Fitment, Welding Cleaning Of 48 Nos Each Tapped Holes Fitment Of Soft Patch Door Along With 5 Mm Thickness Neoprene Gasket And Tighten As Required. , Supply And Fitment Of 20Mm Stud Ss304 For Missing Da Room Soft Patches , Fabrication And Fitment Of Fuel Tank Foundation , Fuel Sounding Pipe Adapter Fitment And Welding (1 – Qty 05 & 2 Flange- Qty 02) , Repair Of Side Light , Fabricate Fit And Welding Of Bracket 24 Nos And Pad 18 Nos , Fabricate And Fitment Of ‘D Shaped Pipe Fender , Supply Of 8018 Welding Rod 3.15Mm And 4Mm For Welding. , Hot Work Assistance Provided For Various Job , Repair And Refurbishment Of Air Vent Pipe 2 Dia , Erection Of Stagging As Required For Ship Side Port And Stbd And Bottom Keep Plate Renewal Where Required During The Period Of Dry Docking. , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Paint Scheme As Follow:- 1 Fc Interguard 269: Dft 150 Micron, Fc Intershield 300: Dft 2*150 Micron, 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360 Spc: Dft 3*150M. B/T Paint Scheme:- 1 Fc Interguard 269: Dft 1 * 50 M, 2 Fc Intershield 300: Dft 2* 150M, 1 Fc Interguard 263: Dft 3*150M, Last Coat Black , U/W Hull Painting Paint Scheme As Follow:- 1 Fc Interguard 263: Dft 1 * 125 M, 3 Fc Antifouling Intersmooth 360Spc: Dft 3*150M , Last Coat Black , Ship Side Surface Including Stem And Transform To Be Blasetd To Sa2.5 & Painted . Paint Scheme As Follow:- 2 Full Coat Interthane 990: Dft 2*60M. , Ship Side To Be Painted. Paint Scheme As Follow:- 2 Full Coat Interthane 990:: Dft 2*60 M , Electrical Conduit Pipes To Be Renewed. , Overhauling Of 02 In Nos Transformers (I) 35 Kva (Make-Marine Electricals (I) Pvt Ltd, Si No 21081/1/21700) (Ii) 40 Kva (Make – Marine Electricals (I) Pvt. Ltd, Si No- 21081/4/51643) To Be Carried Out And Insulation To Be Improved. , Undertake Checks Of Electrical Horn (Make – Mjr Corporations, Type-Sewn50k-Ws) And Prove Its Operations. , Renew Dd Pump Inlet And Outlet Pipes. (Dia-80Mn, Mat – Cuni) Service Cost , Renew Dd Pump Inlet And Outlet Pipes. (Dia-80Mm, Mat0 – Cuni) Material Cost , Solid Buoyant Foam In 04 In Nos Void Tanks To Be Removed For Hotwork Clearance And Stored Safely And Refill Back Post – Work As Required Service Cost , Renew Fuel Lines From Ru Tank To Da Inlet And Return Line From Da To Ru Tank For Both Das (Mat-Ms Dia – 15 Mm) , Renew Fuel Line From Ru Tank To Da Inlet And Return Line From Da To Ru Tank For Both Das (Mat- Ms Dia 15 Mm) Material Cost , Renew Fuel Ru Tank Filing Pipe Along With Cap From Main Deck To Ru Tank. (Dia – 50Mm, Mat – Ms, Service Cost) , Renew Fuel Ru Tank Filing Pipe Along With Cap From Main Deck To Ru Tank. (Dia – 50Mm, Mat – Ms, Material Cost) , Undertake Functional Checks Of Local Control Panel (Lcp) Of Both Dg And Replace/Rectify Defective Instrumentation Wiring Indication, Switches, Alarms Etc. Service Cost , Renew Tube Light Fitting In Dg Compt – 04 Nos Flood Lights – 02 Nos. Service Cost , Renew Tube Light Fitting In Dg Compt – 04 Nos Flood Lights – 02 Nos. Material Cost , Navigational Light Fitting To Renewed Along With Nav Light Holder (02 Stair Type) Service Cost , Navigational Light Fitting To Renewed Along With Nav Light Holder (02 Stair Type) Material Cost , Serviceability Checks Of Both Port And Stdb Capstan Control Panels And Undertake Insulation Checks Of Cabling (100 Mtrs ) Service Cost , Serviceability Checks Of Both Port And Stdb Capstan Control Panels And Undertake Insulation Checks Of Cabling (100 Mtrs ) Material Cost , Serviceability Checks Of Anchor Drives Service Cost , Serviceability Checks Of Anchor Drives Material Cost , Renew Cable For Flood L S (Dia 02 X 1.5 Mm3-100 Mtrs), For Fitment Of Tube Lights ( Dia 02 X 1.5 Sqmm – 80 Mtrs) Service Cost , Renew Cable For Flood L S (Dia 02 X 1.5 Mm3-100 Mtrs), For Fitment Of Tube Lights ( Dia 02 X 1.5 Sqmm – 80 Mtrs) Material Cost , Serviceability Checks Of Inverter Service Cost
|