|
Reconstruction Of The Internal Municipal Road, Plot No. 209, Area Wujówka, Jadów Communethe Scope Of The Investment Includes The Following Elements For A Section With A Length Of Approx. 482 M.B.A) Construction Of A Leveling Layer Of Unbound C90/3 0/31.5 Reclaimed Asphalt Aggregate In Accordance With The Longitudinal Profile, B) Widening Of The Existing Road In Accordance With The Existing Plan, C) Construction Of A New 4.0 M Wide Road Surface Made Of Asphalt Mixture In Two Layers Of 4 Cm Each, D) Construction Of Double-Sided Roadsides With A Width Of 0.50 M Along The Entire Length Of The Section, E) Replacement Of The Culvert Under The Road Crown At Km 0+479 With A Pe-Hd Sn-8 Pipe, 40 Cm Long, 10 M Long With Prefabricated End Walls, F) Construction Of Height Connections On The Existing Exits Made Of Mechanically Stabilized Crushed Aggregate 0/31.5. Pavement Structure A) Wearing Surface - Asphalt Concrete Ac 11S, Binder 50/70 Kr1-2, 4 Cm, B) - Binding Surface - Asphalt Concrete Ac 16W, Binder 50/70 Kr1-2, 4 Cm, C) - Leveling Layer Of Unbound Aggregate 0/31.5 Reclaimed Asphalt, D) Widening Structure: - Lower Foundation Layer Made Of Crushed Aggregate From Recycled Concrete 0/63 C 50/30, Thickness. 30 Cm, - Upper Foundation Layer Of Crushed Stone Aggregate 0/31.5 C90/3, Layer Thickness After Compaction 10 Cm, E) Roadside Structure: - Mechanically Stabilized Crushed Stone Aggregate 0/31.5 Gr. 10 Cm. In Addition To Works In The Road Industry, Height Adjustment Of Water Supply Devices And Relocation Of A Hydrant, As Well As Desilting Of A Ditch Along The Road Of Approx. 420 M. Scope Of Works And Sequence Of Construction Of The Facility: A) Preparatory Works, B) Earth Works, C) Replacement Of Drainage Elements, D) Construction Of The Road Surface, E) Works Related To Traffic Management, F) Finishing Works., G) Construction Of Surveying As-Built Inventory, Attention! The Detailed Scope Of The Subject Of The Order Is Specified In The Technical Design Constituting Annex No. 1 To The Swz, Which Consists Of: Design Documentation And Technical Specification For The Execution And Acceptance Of Construction Works, As Well As, Additionally, The Bill Of Quantities
|