|
1. The Subject Of The Order Concerns Reconstruction Of The Agricultural Transport Road In Pierzaki. The Scope Of Works Includes, Among Others: A) Preparatory Works: - Measuring Works, - Mechanical Grubbing-Up Of Copses, - Removal Of Stumpwood. B) Construction Of The Sub-Base: - Earthworks With Backhoe Excavators Along With Transport Of Excavated Material By Trucks, - Profiling And Compaction Of The Subsoil For Construction Layers, - Sub-Base Made Of Crushed Aggregate - Lower And Upper Layers, C) Preparation Of The Surface Road: - Cleaning And Sprinkling The Crushed Stone Base With Asphalt Emulsion, - Surfaces Made Of Mineral And Bituminous Mixtures (Binding Layer), - Surfaces Made Of Mineral And Bituminous Mixtures (Wearing Layer), D) Construction Of The Roadside: - Mechanical Shearing Of The Roadside, - Substructure Made Of Crushed Aggregate - Upper Layer, E) Replacement - Renovation Of The Culvert: - Dismantling The Culvert, - Cleaning The Ditches From Silt With Profiling Of The Ditch Slopes, - Construction Of A Gravel Foundation, - Construction Of End Walls, - Construction Of A Culvert Made Of Concrete Pipes, F) Replacement Of Markings: - Road Sign Post Made Of Steel Pipe, - Attachment Of The Road Sign Board.2. A Detailed Description Of The Subject Of The Order Is Included In The Supplements To The Swz, Which Consists Of The Following Documents: 1. Draft Contract. 2. Construction Design, 3. Technical Specification. 4. Bill Of Quantities (For Illustrative Purposes, Due To The Nature Of The Remuneration - Lump Sum, Serves Only An Informational Function).3. Supplementary Works Required By The Ordering Party: 1) Geodetic Marking Out Of The Investment, 2) Preparation Of Acceptance Documentation Containing At Least: A) The Original Written Declaration Of The Construction Manager: - On The Execution Of Works In Accordance With The Construction Design And The Construction Law, - On Ensuring The Proper Condition And Order Of The Construction Site, As Well As Roads, Streets And Neighboring Properties, - On The Appropriate Development Of The Areas Adjacent To The Construction Site Enabling Proper Operation Of The Constructed Facility. B) List Of Built-In Facilities Materials, C) A List Of Significant Changes (If Any) With A Graphic Attachment, Signed By The Construction Manager, Supervision Inspector, Designer, Along With Documents Confirming The Correct Legalization Of These Changes, D) Reports On Tests (If Any) Performed During The Implementation Of Construction Works, E) Geodetic Confirmation Of The Quantities Of Works Performed.
|