1 Part I Of The Subject Of The Order, Which Includes: A) Changing The Heating Method From Coal To Gas Heating In The Premises: - 64-100 Leszno, Ul. Pl. Metziga 9/9 The Scope Of Work For The Above-Mentioned Location Includes, In Particular: − Dismantling Tiled Stoves, − Replenishing The Floor After The Dismantled Stoves, − Installation Of The Flue Gas Duct, − Internal Installation. Gas Installation, − Execution Of Central Heating Installation Made Of Copper Pipes With Installation Of Plate Radiators And A Dual-Function, Condensing Gas Furnace With A Closed Combustion Chamber With A Power Of 24Kw, B) Changing The Heating Method From Coal To Gas Heating In The Premises: - 64-100 Leszno, Ul. Niepodległości 33/6 The Scope Of Work For The Above-Mentioned Location Includes, In Particular: − Dismantling Of Tiled Stoves, − Replenishing The Floor After The Dismantled Stoves, − Installation Of A Flue Gas Duct, − Execution Of Internal Gas Installation, − Execution Of Central Heating Installation Made Of Copper Pipes With Installation Of Plate Radiators And A Dual-Function, Condensing Gas Furnace With A Closed Combustion Chamber With A Power Of 24Kw, C) Changing The Heating Method From Coal To Gas Heating In The Premises: - 64-100 Leszno, Ul. Niepodległości 14/8 The Scope Of Work For The Above-Mentioned Location Includes, In Particular: − Dismantling Tiled Stoves, − Replenishing The Floor After The Dismantled Stoves, − Installation Of The Flue Gas Duct, − Execution Of Internal Gas Installation, − Execution Of Central Heating Installation Made Of Copper Pipes With Installation Of Panel Radiators And A Dual-Function, Condensing Gas Furnace With A Closed Combustion Chamber With A Power Of 24Kw, - Construction Of A Boiler Room Room From The Common Part Of The Attic, In Accordance With The Attached Design Documentation (Appendix No. 10A, To The Swz). Note: It Is Recommended That The Contractor Conduct An On-Site Inspection Of The Place Of Work. The Lack Of Participation Of The Contractor In The On-Site Visit Does Not Release The Contractor From The Obligation To Make Additional The Utmost Care When Preparing The Offer. The Costs Of The On-Site Inspection Of The Work Site Will Be Borne By The Contractor. Note: The On-Site Inspection Will Be Carried Out With The Participation Of A Designated Representative Of The Building Manager (Mzbk), On May 25, 2026, From 10:00 A.M. To 12:00 P.M. - Part I Of The Subject Of The Order - After Prior Contact With Mr. Zdzisław Loman Via E-Mail: Tender@Mzbk-Leszno.Pl, Or By Phone At 65 5268630 Ext. 105, The Ordering Party Informs That The On-Site Visit Is A Separate Institution From The Institution Of Asking The Contractor To Clarify Or Change The Content Of The Swz In Terms Of The Description Of The Subject Of The Contract And The Terms Of The Contract. During The Visit, The Ordering Party Does Not Provide Explanations To The Participants Of The On-Site Visit Regarding The Content Of The Swz Required Works And/Or Verification By The
|