Review The Existing Emergency Power System, Including The Generator Room, Electricalrooms, And Associated Infrastructure. Assess The Condition, Capacity, And Configuration Of The Existing Emergency Generator,Automatic Transfer Switches (Ats), And Fuel Storage System. Confirm Emergency Power Capacity And Performance Requirements Based On Currentcodes, Healthcare Facility Standards, And Critical Load Demands. Develop Engineering Design Documents For Replacement Of The Existing Emergencygenerator System With A Nominal 150 Kw Diesel Unit. Prepare Design For Upgrades To The Automatic Transfer Switch Systems To Accommodatecurrent And Future Emergency Electrical Loads. Develop Design Criteria And Layout For Replacement Of The Diesel Fuel Storage System,Including Integration With The Generator And Regulatory Compliance Considerations. Evaluate Requirements For Temporary Emergency Power To Maintain Uninterruptedservice To Critical Hospital Systems During Construction And Changeover. Prepare Coordinated Electrical And Mechanical Design Drawings And Specificationssuitable For Construction Procurement. Identify Structural, Architectural, And Spatial Considerations Associated With Generator,Ats, And Fuel System Upgrades. Identify Power Distribution, Grounding, And System Coordination Requirements Associatedwith The Upgraded Emergency Power System. Define Testing, Verification, And Commissioning Requirements To Validate Systemperformance, Reliability, And Compliance. Provide Construction-Phase Engineering Support, System Commissioning Oversight, Andrecord Documentation Requirements.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113301733
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.