|
1. The Subject Of The Order Includes The Execution Of Construction Works Consisting Of: Construction Of A Playground At The Local Government Kindergarten No. 3 In Przysucha: - Playground - Part With A Polyurethane Surface: - Execution Of Demolition And Dismantling Works, Construction Of A Safe Polyurethane Surface, Safe Polyurethane Surface, Flexible, Jointless, Anti-Slip, Water-Permeable, Two-Layer, Foldable, Installed Directly On The Construction Site Where The Playground Equipment Will Be Located, Framed With Concrete Edges On A Concrete Bench With Support; Delivery And Installation Of Devices: Double Weight Swing - 2 Pcs., Double Spring Rocker - 1 Pc., Double Swing Swing - 2 Pcs., Two Nets With A Pipe - 1 Pc., Spring Rocker - Animal - 2 Pcs., Recreational Play Set - 1 Set, Disc Carousel - 2 Pcs., Locomotive Set - 1 Pc., Slide - 1 Pcs., Wagon Set - 1 Pc., Benches With Backrests - 6 Pcs., Waste Bin - 2 Pcs., Information Board With Regulations For The Use Of The Square - 1 Pc., Construction Of Communication Routes From Red Concrete Paving Stones, 6 Cm Thick; - Relaxation And Education Zone: - Construction Of Communication Routes From Concrete Paving Stones, Thickness. 6Cm; Delivery And Installation Of Devices: Tic-Tac-Toe Board – 1 Pc., Clock Board – 1 Pc., Abacus Board – 1 Pc., Chalk Drawing Board – 1 Pc., Benches With Backrest – 8 Pcs., Waste Bin – 2 Pcs.; Greenery And Plantings; Construction Of A New Fence For The Playground, System Panel Fencing, Height 1.20 M, With Two Gates, Width 1.00 M; And Repair Of Existing Panel Fencing;2. Investment Location: The Planned Investment Is Located In Przysucha On Part Of Plots No. 1830/3; 1829/3; 1828/3; 3621/3; 1827/3; 1833/3; 1831/3; 1832/3 Registration Unit: 142306_4 - Przysucha - Town, District: 142306_4.0001 Przysucha.3. The Plots Are Not Entered In The Register Of Monuments And Are Not Protected Under The Local Development Plan, And Are Not Located Within The Mining Area.4. A Detailed Description Of The Subject Of The Order, Including: Minimum Requirements Of The Ordering Party Regarding: Technical And Technological Parameters, Material Solutions, Requirements For The Execution And Acceptance Of Construction Works, Warranty Conditions, Contractors Obligations, Etc. Are Specified In The Following Documents: A) Construction Design, B) Technical Design, C) Technical Specification For The Execution And Acceptance Of Construction Works, D) Draft Contract Constituting Annex No. 1 To Swz.5. The Order Also Includes Accompanying And Temporary Works Not Covered By The Order Description, Necessary To Be Taken Into Account Due To The Provisions Of Construction Law And For Their Proper Completion. These Works Include In Particular: 1) Organization, Security And Appropriate Marking Of The Construction Site. 2) Preparation Of Documentation For Final Acceptance. 3) Liquidation Of The Construction Site And Its Tidying Up. 6. The Estimated Bill Of Quantities Attached To The Swz Does Not Constitute A Description Of Th
|