Construction Work For Highways, Roads - Design And Implementation Of The Task Entitled: Extension Of National Road No. 73 On The Pilzno - Brzostek Section. The Subject Of The Order Is: Design And Implementation Of The Task Entitled: Expansion Of National Road No. 73 On The Pilzno - Brzostek Section. The Subject Of The Order Is The Design And Expansion Of National Road No. 73 On The Pilzno - Brzostek Section. The Order Includes: 1) Prepare The Contractors Documents Specified In Detail In The Fup And Obtain The Necessary Permits To Perform The Works 2) Carry Out The Construction/Expansion And Reconstruction Of A National Road With A Length Of Approx. 9.4 Km, Including Demolition Of The Existing Road Structure; 3) Construction Of Sewerage Intersections, Which Will Connect The Dk73 Road With The Existing Road System; 4) Reconstruction Of Existing Roads In The Scope Of Collisions With The National Road; 5) Construction Of Roads Other Than The National Road, Including Changing The Alignment Of Existing Roads, 6) Construction Of Roads Additional, Located In The Road Right-Of-Way Of The National Road 7) Carry Out The Construction And Reconstruction Of Infrastructure For Pedestrians And Cyclists, 8) Construct Road Engineering Structures, Including - Demolition And Construction Of A New Bridge Structure At Km Approx. 138+786 (Object Designation Md/I/2/2A; M-2/1) - Renovation Of The Existing Bridge Structure At Km Approx. 139+775 (Designation Md/I/3/2A; M-2/2) And The Construction Of A New Bridge Structure For A Pedestrian And Bicycle Route In Its Immediate Vicinity - Expansion Of The Existing Bridge Structure At Km Approx. 142+691 (Object Designation Md/Ii/1/1B; M-2/3) - Construction Of Culverts 9) Construct An Area Drainage System, Including Drainage Devices For The Road Body: Road Ditches, Rainwater Drainage, Pre-Treatment Devices, Retention, Retention And Infiltration Reservoirs And Others, 10) Implement Environmental Protection Devices, In Particular: Acoustic Protection, Animal Crossings, Ecological Culverts With Protective And Guiding Fencing, Greenery, Anti-Glare Screens, 11) Construct Infrastructure For Facilities On The National Road Located Along The National Road, Including: Power Supply And Lighting Networks, Traffic Lights, Water Supply Networks, Sewage Treatment Networks And Devices, Storm Sewage System With Devices Pre-Cleaning And Other, 12) Reconstruction Of Conflicting Devices And Networks Of Existing Underground And Above-Ground Infrastructure: Telecommunications And Energy Devices, Water Supply Networks, Rainwater And Sewage Disposal Systems, Gas Networks, Drainage And Hydrological Devices, Railway Devices And Others, 13) Carry Out Demolition Of Buildings And Structures, Demolition Of Road Elements, Culverts And Others, 14) Telecommunications Network For The Needs Of Of The Ordering Party, 15) Road Lighting, 16) Carry Out The Target Traffic Organization, Including Road Traffic Safety Devices, 17) Carry Out The Traffic Management System, 18) Carry Out The Construction Of 17 Bus Bays, 19) Carry Out The Construction Of 2 Places For Checking And Weighing Vehicles, 20) Carry Out The Planting
|