Road Construction Works – Reconstruction Of Ul. Partyzatów Koleczkowskich In Kielno - Access To The S6 Route Junction. 1. The Subject Of The Order Is The Reconstruction Of Ul. Partyzatów Koleczkowskich In Kielno - Access To The S6 Route Junction In Accordance With The Decision To Authorize The Implementation Of A Road Investment Consisting In The Expansion Of The Kielno - Koleczkowo Roads In The Szemud Commune No. Ab.6740.11.25.2021.19 Of December 2022. The Total Length Of The Reconstructed Route Is Approximately 2 Km And Includes Stage 1, Stage 2A And Stage 2B Without A Roundabout (According To The Overview Drawing Specifying The Scope Of Work). The Expansion Of The Above-Mentioned Street System Will In Particular Involve: Demolition (Surface) Works, Earthworks - Land Leveling, Excavations For The Planned Networks, Construction Of A Rainwater Drainage System, Construction Of A Gas Network (In Part), Construction Of Lighting, Construction Of A Service Channel, Reconstruction Of Collisions, Among Others. Power And Telecommunications Networks, Variable Works - Backfilling Of Excavations, Leveling The Ground, Construction Of Road Surfaces, Execution Of Vertical And Horizontal Markings. The Investment Assumes The Construction Of A Road 6 M-7 M Wide, The Construction Of A 2.0 M Wide Sidewalk, And The Construction Of A 3.0 M Pedestrian And Bicycle Route. The Road Surface Structure Will Consist Of A Wearing Course Of Crushed Stone Mastic With A Thickness Of 4 Cm, Binding Layer Of Asphalt Concrete, Thickness. 6 Cm, Base Base Made Of Asphalt Concrete, Thickness. 10 Cm, Base Made Of Mechanically Stabilized Crushed Aggregate, Thickness. 20 Cm, Cement-Stabilized Soil, Thickness. 22 Cm And Thickness 20 Cm. The Scope Of Work Also Includes The Construction Of Cobblestone Exits (In Accordance With The Pzt), Construction Of Bus Bays, And Construction Of Elevated Pedestrian Crossings. The Scope Of The Investment Does Not Include The Construction Of A Sewage And Water Supply Network (The Water Supply And Sewage Network Will Be Constructed By Gpk Szemud. The Contractor Is Obliged To Cooperate With The Company In This Respect). The Deadline For Implementing The Basic (Guaranteed) Scope Is December 31, 2028. 2. The Ordering Party Intends To Exercise The Option Right Pursuant To Art. 441 Section 1 Of The Act Of September 11, 2019 - Public Procurement Law (Journal Of Laws Of 2024, Item 1320, As Amended) By December 31, 2029. 3. The Contractor Is Obliged To Perform Post-Construction Geodetic Measurement Of Individual Tasks; Documentation Stamped With Appropriate Stamps Confirming Positive Control By The District Office Should Be Submitted In Writing - 3 Copies And Electronically (Pdf Or Jpg And A File Opened By The Cartographic Program Mmp Or Dxf). 4. The Contractor Will Be Obliged To Obtain Partial Use Permits After Completing Each Stage, I.E. Stage 1, Stage 2A, Stage 2B (Option 1 And Option 2 If Applicable). 5. A Detailed Description Of The Subject Of The Order Was Specified In The Opz (Technical Documentation, Technical Specifications, Bill Of Quantities) In Annex No. 2 To The Swz.
|