|
Bids Are invited for Refurbishment And Replacement Of Electrical Panels Supply Part For Retrofitting Of Lt Panel By Supply And Installation - Supply Part For Retrofitting Of Lt Panel By Supply & Installation Of 1250A,50Ka,Edo Acb Along With Suitable Bus Bar Rating At North & Ss2 Lt Panels As Per Technical Specification & Sow. , Service Part For Retrofitting Of Lt Panel By Supply And Installation - Service Part For Retrofitting Of Lt Panel By Supply & Installation Of 1250A,50Ka,Edo Acb Along With Suitable Bus Bar Rating At North & Ss2 Lt Panels As Per Technical Specification & Sow. , Supply Of Main Incoming Lt Power Distribution Panels Slipway - Supply Of Main Incoming Lt Power Distribution Panels Slipway-2&3 As Per Technical Spec & Sow. , Install, Replace, Test And Commissioning Of Main Incoming Lt Power Distribution Panels Slipway - Install, Replace, Test And Commissioning Of Main Incoming Lt Power Distribution Panels Slipway-2&3 (4Nos.) As Per Technical Spec & Sow. , Supply Of Welding And Lighting Panels Slipway - Supply Of Welding And Lighting Panels Slipway-2&3 (17Nos) As Per Technical Spec & Sow. , Install, Replace, Test And Commissioning Of Welding And Lighting Panels Slipway - Install, Replace, Test And Commissioning Of Welding And Lighting Panels Slipway-2&3 (17Nos) As Per Technical Spec & Sow. , Supply Of 3.5C X 400 Sq.Mm Aluminum Cable From Substation-02 To Slipway - Supply Of 3.5C X 400 Sq.Mm Aluminum Cable (From Substation-02 To Slipway-2&3 Main Incoming Panels) As Per Technical Specification & Sow. , Laying, Fixing, Testing And Commissioning Of 3.5C X 400 Sq.Mm Aluminum Cable From Substation-02 To Slipway - Laying, Fixing, Testing And Commissioning Of 3.5C X 400 Sq.Mm Aluminum Cable (From Substation-02 To Slipway-2&3 Main Incoming Panels) As Per Technical Specification & Sow. , Supply Of 3.5Cx 185 Sq.Mm Aluminum Cable From Slipway-2 And 3 Main Incoming Panels To Welding And Lighting Panels - Supply Of 3.5Cx 185 Sq.Mm Aluminum Cable (From Slipway-2&3 Main Incoming Panels To Welding And Lighting Panels) As Per Technical Specification & Sow. , Laying, Fixing, Testing And Commissioning Of 3.5Cx 185 Sq.Mm Aluminum Cable From Slipway-2 And 3 Main Incoming Panels To Welding And Lighting Panels - Laying, Fixing, Testing And Commissioning Of 3.5Cx 185 Sq.Mm Aluminum Cable (From Slipway-2&3 Main Incoming Panels To Welding And Lighting Panels) As Per Technical Specification & Sow. , Supply And Fitment Of Suitable End Termination Kits - Straight Through Joints Kits Of Required Quantity To All The Incoming And Outgoing Cables At Both Ends Of Slipway-02, Slipway-03, Substations, Etc - Supply And Fitment Of Suitable End Termination Kits / Straight Through Joints Kits Of Required Quantity To All The Incoming & Outgoing Cables At Both Ends Of Slipway-02, Slipway-03, Substations, Etc., As Per Tech Spec. & Sow , Providing Earth Pits With 75Mm Ci Pipe As Is Standards - Providing Earth Pits With 75Mm Ci Pipe As Is Standards As Per Technical Specification & Sow. , Supply And Laying Of Gi Flat 50 X10 Mm Necessary Joints With Nut And Bolts From Earth Pit To Panel Boards - Supply And Laying Of Gi Flat 50 X10 Mm Necessary Joints With Nut And Bolts From Earth Pit To Panel Boards As Per Technical Specification & Sow , Repair And Excavation Of Cable Trench Of 75Mm Thick Up To 90Cm Depth - Repair And Excavation Of Cable Trench (Of 75Mm Thick) Up To 90Cm Depth As Per Technical Specification & Sow. , Fixing Of Perforated Cable Tray On Slipways 02 And 03 And Securing Of Cables With Metal Ties And Capping And Casing To Be Provided - Fixing Of Perforated Cable Tray On Slipways 02 & 03 And Securing Of Cables With Metal Ties And Capping & Casing To Be Provided As Per Technical Specification & Sow. , Foundation For All Lt Panels I.E. Steel Foundations With Concrete Pedestal For Panels All Incoming And Welding And Lighting Panels - Foundation For All Lt Panels I.E. Steel Foundations With Concrete Pedestal For Panels (All Incoming And Welding & Lighting Panels As Per Technical Specification & Sow. Total Quantity : 16994
|