The Subject Of The Order Is The Implementation Of Construction Works Consisting In Bringing The Building From An Open Shell State To A Condition Enabling The Use Of The Facility In Accordance With Its Intended Purpose. Currently, The Building Is In An Open Shell State. The Roof Is Covered With Boarding And Secured With Underlay. The Scope Of The Task Includes: 1) Installation Of Counter Battens And Patches For The Roof Covering, 2) Installation Of A Roof Covering Made Of Metal Tiles, 3) Installation Of Roof Flashing And Roof Details, 4) Installation Of Roof Communication Elements, Including Chimney Steps, 5) Installation Of Window Joinery For Internal And External Sills, 6) Installation Of External And Internal Solar Doors, 7) Installation Of Roof Hatches, 8) Installation Of A System Ceiling With Fire-Resistant Plasterboards On A System Frame In Some Rooms, 9) Construction Of A Modular Suspended Ceiling With Dimensions Of 60X60 Cm That Does Not Spread Fire, Class C Sound Absorption And Acoustic Pressure, 10) Construction Of Floors With Thermal And Moisture Insulation, 11) Construction Of A Floor Made Of Fire-Resistant Osb Boards In The Unused Attic, 12) Execution Of Internal Plasters Cement-Lime And Mineral Thin-Layer Smooth Trowelled, 13) Construction Of A Lightweight Wall Made Of Plasterboards In The Attic And Light Construction In Toilets, 14) Installation Of Sanitary Cabins And Separating Walls In Toilets, 15) Painting Of Walls And Ceilings, 16) Construction Of Ceramic And Stoneware Tiles, Decorative Cladding, 17) Construction Of Cold And Hot Water Installations, Installations Hydrant With Leakage Tests. Construction Of A Water Connection, 18) Construction Of A Sanitary Sewage System With Connection To The Network, Including Leakage Tests, 19) Construction Of A Central Heating Installation, Installation Of A Gas Boiler And Radiators, And Performance Of Leakage Tests Of The Central Heating Installation, 20) Construction Of A Connection To The Gas Network. Construction Of Gas Installation. Carrying Out Tightness Tests Of Gas Installations, 21) Carrying Out Gravity And Mechanical Supply And Exhaust Ventilation With Heat Recovery, Carrying Out Tightness, Effectiveness And Noise Tests, 22) Carrying Out Electrical Installations, Including Building Power Supply, Internal Installations, Fire And Lightning Protection, Including Measurements Confirming The Safety Of Use, 23) Building A Ramp And Reinforced Concrete Entrance Stairs To The Building, Including Finishing And Installing Balustrades, 24) Execution Of Thermal Insulation Of External Walls And Facade Works, 25) Construction Of A Band Around The Building, 26) Interior Finishing And Adaptation Of Rooms For The Purposes Of The Olioc Warehouse. 27) Development Of The Area Around The Building, Including Hardening, Linear Drainage, Sidewalks, Parking Spaces, Lawns, Installation Of A Garbage Cover, Reconstruction Of Part Of The Fence, 28) Preparation Of As-Built Documentation And Obtaining An Occupancy
|