The Subject Of The Order Is The Partial Renovation Of Building No. 130 In The Military Complex In Pruszcz Gdański At Ul. Powstańców Warszawy 28 B. Scope Of Works: Basic Order: Renovation Of Rooms 109-123 Of Corridor No. 4.5 Of The 1St Floor And Partial Of Washrooms No. 1 And 2 Of The 3Rd Floor In Building No. 130 - Tearing Off Pvc Floor Coverings (Rooms) And Ceramic Tiles (Corridors) - Dismantling Old Internal Doors Together With Door Frames, - Dismantling Brick Partition Walls And Widening Door Openings - Making A Leveling And Smoothing Base Using Self-Leveling Cement Mortars, - Making System Partition Walls With K-G Tiles On A Steel Grid, - Installing New Steel Internal Doors With Equipment - Scraping And Washing Old Paint From The Walls In The Above-Mentioned Areas. Rooms And Corridors, - Applying New Cement-Lime Plasters In Door Jambs, - Priming Plasters With Primers For Gypsum Plasters On Plasters, - Applying Leveling Plasters And Gypsum Plasters On The Walls And Ceilings Of The Above-Mentioned Rooms, - Double Painting Of Gypsum Substrates With Latex Emulsion Paints, - Preparation Of The Base And Covering Of Walls With Pvc Carpet Strips - Covering The Floors With Carpet, Pvc And Stoneware Tiles, - Installation Of A Suspended Ceiling Over The Corridor No. 4.5 And Replacement Of Ceiling Tiles 60X60 Cm In Washrooms No. P/T And N/T Electrical Installation (Replacement Of The Old Electrical Installation With A New One), - Delivery And Installation Of Lighting Fixtures, - Delivery And Installation Of New Equipment (Sockets, Switches, Etc.), - Installation Of Floor Switchboards With Connection Of New And Old Circuits, - Installation Of System Pvc Channels And Steel Ceiling Trays (Corridors 3, 4, 5) With Installation Of Power Sockets, Including Data Sockets, And Rj Sockets 45 For Telephone And Rj45 Ict Installations, - Installation Of Electrical, Ict And Telephone Installation Cables In Pvc Channels (Rooms) And Steel Ceiling Trays (Corridors 3, 4, 5). - Connection Of Not Replaced Circuits To New Switchboards. In Sanitary Works: - Execution Of Water And Sewage Installation, Connection Of 3 Sinks. Investors Materials Basic Order: 1 Sheet Metal Sections - Wall Angle - Pcs. 11.00002 Protective Corners - M 66.00003 Domino Gris Stoneware Tiles 33.3X33.3 - M2 309.09274 Mineral Fiber Slabs Pronunciation 60X60x1.5 Cm - Pcs. 93.00005 Wall Profile For U100 Plasterboards - M 21.00006 Main Profile T24/33 - Pcs. 15.00007 Cross Profile, 60 Cm Long T24/60 - Pcs. 92.0000 Other Materials Are Provided By The Contractor.1. Order Completion Date: A) Basic Order: 10 Weeks From The Date Of Handover Of The Construction Siteb) Order Executed Under The Option Law: 10 Weeks From The Date Of Handover Of The Construction Site, Which Will Take Place No Later Than The 12Th Week From The Date Of Signing The Contract.2. Construction Works May Be Carried Out On Working Days From Monday To Friday From 7:30 A.M. To 15:30. 3. Place Of Execution Of The Order: 49. Blot In Pruszcz Gdański
Contact Information
Address
22 Baza Lotnictwa Taktycznego,Malbork,82-200,Pomorskie,Pl638 - Starogardzki
Email
22blt.przetargi@ron.mil.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112798148
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.