|
The Subject Of The Order Is The Modernization Of Vacant Buildings In The Housing Stock Of The Housing Management Plant In The Scope Of Renovation Of Residential Premises No. 11 In A Multi-Family Building Located In Rybnik At Ul. Mikołowska 29. Material Scope Of The Subject Of The Order: 1. General Construction Works: 1) Demolition Works: A) Dismantling Partition Walls Made Of Plasterboards, B) Removing Wooden Door Frames From The Wall, C) Dismantling Floors And Wall Tiles, D) Removing Ventilation Grilles And Doors From The Wall, E) Removing Loose Internal Plasters, F) Dismantling Doors And Windows, G) Removing Them From The Wall Window Sills And External Window Sills, 2) Flooring And Cladding Works: A) Tearing Off The Plastic Floor, B) Dismantling Wall Strips, C) Tearing Off The Cement Plinth, D) Preparing The Substrate, Moisture-Proof Insulation, E) Making Self-Leveling Screeds, F) Making Floors With Gres Tiles, G) Facing The Walls With Ceramic Tiles (Bathroom, Kitchen), H) Making Floors With Panels Floors,I) Sanding, Priming And Varnishing Of Parquet. Note: The Floors Should Be Made So That The Level In All Rooms Is The Same.3) Bricklaying And Plastering Works: A) Removing Fungus From The Walls By Greasing (Pantry), B) Bricking Up The Door Opening And Leveling Recesses Under The Windowsc) Casing The Sanitary Sewerage Line With Plasterboards Along With Making Revisions, E.G. Counterad) Replenishing Plasters On Walls And Ceilingse) Insulating The External Walls From The Inside With Thermal Insulation Boards Made Of Aerated Concrete With A Density Of ≤ 115 Kg/M3f) Priming The Substrates,4) Painting Works: A) Removing Old Wallpaper From The Walls And Ceilings,B) Preparing The Substrate For Painting - Removing Cracks, Cleaning, Washing, Filling The Surfaces,C) Applying Gypsum Plasters On The Walls And Ceilings Ceilings, D) Painting With Latex Paints, E) Regeneration And Painting With Oil Paints Of Door Frames And Door Leaves Along With Replacing Locks, Handles, Signs (Glazed Doors For Double And Triple Rooms, Entrance Doors), 5) Replacement Of Window And Door Joinery: A) Delivery And Installation Of Pvc Window Joinery With Pressure Air Vents, B) Delivery And Installation Of Window Sills With Pvc,C) Delivery And Installation Of External Window Sills,D) Delivery And Installation Of Internal Doors With Adjustable Wooden Frames,E) Delivery And Installation Of Door Leaves Adapted To Existing Frames,F) Renovation Of Door Frames,6) Finishing Works (Kitchen Equipment):A) Delivery And Installation Of A Cooker With A Ceramic Hob And An Oven,B) Delivery And Installation Of A Cabinet With A Sink With A Drainer,C) Installation Ventilation Grills In The Kitchen And Bathroom, 2. Installation Works: 1) Sanitary Installations: A) Disassembly Of The Existing Water And Sewage Installation, B) Dismantling Of The Gas Installation, C) Dismantling Of Bathroom Fittings, Bathtub, Washbasin, Toilet Bowl, D) Installation Of Plastic Pipelines For Cold And Hot Water, E) Install
|