1. The Subject Of The Order Are Construction Works On The Task Titled: Increasing The Logistics Potential Of The Sanok Commune By Creating A Central Olioc Warehouse.2. The Scope Of Works Includes The Renovation Of A Building In Czerteż (Building On The Plot With Registration Number 513/1), In Particular: - Renovation Of Chimneys, - Replacement Of Roof Covering And Elements, - Replacement Of Windows And Doors (Internal And External), - Construction Of Substructure And Floors, - Internal Finishing Works, - Ceiling Insulation, - External Finishing Works - Wall Insulation, External Stairs, - Electrical Installations, - Sanitary Installations, Installation Of Central Electric Heating, - Installation Of Photovoltaic Panels, - Installation Of An Energy Storage Facility, - Installation Of Monitoring, - Development Of The Area Around The Facility, - Reconstruction Of The Internal Access Road.3. A Detailed Description Of The Subject Of The Order Can Be Found In The Bill Of Quantities Constituting Annex No. 1 To Swz.4. The Subject Of The Order Will Be Implemented Under The Civil Protection And Civil Defense Program For 2025/2026.5. Due To The Fact That The Remuneration Will Be A Cost Estimate, The Bills Of Quantities Attached To The Swz Are Binding. The Contractor Is Obliged To Prepare An Offer Cost Estimate (Offer Cost Estimates) Based On The Bills Of Quantities Received From The Ordering Party, Using The Price Base He Adopted For Cost Estimation And After Adding Vat. The Bid Cost Estimate(S) Must Be Consistent With The Bill Of Quantities And Should Include The Basis For The Valuation Of The Works, A Description Of The Works Consistent With The Description Included In The Bill Of Quantities, The Measurements Used In The Bill Of Quantities And A Flat-Rate Net Unit Price For Each Item Of The Bill Of Quantities(S). The Offer Cost Estimate (Offer Cost Estimates) Should Be Prepared In Accordance With Point 13.8 Of Swz.6. Equivalent Solutions. In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Bills Of Quantities, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Bills Of Quantities, The Contractor Should Assume That Each Reference Used In The Bills Of Quantities Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Bills Of Quantities, It Means That They Are Given As Examples And Specify Only The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Use Equivalent Materials Or Devices, But With No Worse Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Pr
Contact Information
Address
Gmina Sanok,Sanok,38-500,Podkarpackie,Pl821 - Krośnieński
Contact No.
134656551
Email
k.kaczak@gminasanok.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112797975
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.