1. The Subject Of This Procedure Is The Implementation Of The Task Consisting In The Preparation Of Complete Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And Obtaining The Necessary Decisions, Opinions And Permits, A Final Decision On A Building Permit Or An Unprotested Notification Of The Intention To Perform Construction Works And The Implementation Of Construction Works For The Task Entitled: Thermal Modernization Of The Primary School. Border Protection Corps And The Public Library In Bolesławiec - In The Design-Build Formula, With The Ordering Party Dividing The Order Into Parts: Part I - Thermal Modernization Of The Primary School. Border Protection Corps In Bolesławiec. Part Ii - Thermal Modernization Of The Public Library In Bolesławiec.2. The Investment Is Located In The Bolesławiec Commune, In The Towns Of Bolesławiec In Wieruszów County, Łódź Voivodeship.3. As Part Of The Order, The Contractor Is Obliged To: A) Develop A Technical Concept Based On The Functional And Utility Program (Hereinafter Referred To As The Ffu), Taking Into Account The Assumptions Of The Audit And The Ornithological And Chiropterological Opinion (Hereinafter Referred To As The Ornithological Opinion), B) Prepare Design Documentation In Accordance With The Principles Indicated In Points 5 And 6, C) Prepare The Technical Specification For The Execution And Acceptance Of Works (Hereinafter Referred To As Stwior),D) Carry Out Construction And Assembly Works To The Extent Specified In The Fup (Taking Into Account The Assumptions Of The Audit And The Ornithological Opinion) And The Design Documentation Prepared On Its Basis,E) Perform Authors Supervision.The Developed Design Documentation Must Meet The Scope And Requirements Indicated In The Swz And The Draft Contract.9. Construction And Assembly Works In Part They Include In Particular: 1) Scope Of Thermal Modernization Works A) Insulation Of External Walls B) Insulation Of Ground Floor Walls C) Insulation Of The Flat Roof D) Replacement Of Window Frames E) Replacement Of Door Frames F) Replacement Of The Heating Source 2) The Scope Of Accompanying Works Includes, Among Others: A) Strip Around The Building - Installation Of A New Strip B) Window Sills - Installation Of New Internal And External Window Sills C) Lightning Protection Installation - Installation Of A New Lightning Protection Installation D) Gutters - Reconstruction E) Sheet Metal Flashings On The Roof F) Chimneys - Renovation Of Chimneys G) Roofs - Renovate Existing Ones, Install New Ones In Missing Places H) Renovation Of Fuel Storage Rooms I) Stairs - Modernization. The Parameters Have Been Included In The Energy Audit Cards Prepared For Both Buildings.3) Construction Works Will Be Carried Out In An Active School Building, Therefore The Contractor: A) Is Obliged To Fully And Tightly Fence The Work Area In A Way That Prevents Access By Unauthorized Persons, In Particular Students And School Staff.
Contact Information
Address
Gmina Bolesławiec,Bolesławiec,98-430,Łódzkie,Pl714 - Sieradzki
Email
fu@boleslawiec.net.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112797966
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.