1. Subject Of The Orderthe Subject Of The Order Is The Development Of Design Documentation For The Modernization Of The Swimming Pool At The Primary School In Zebrzydowice. A. Pool Parameters: - Location - Zebrzydowice Ul. Jana Kochanowskiego 55 - Year Of Construction - 2004 - Area Buildings - 628 M2 - Area Usable Area - 1,096 M2 - Cubic Capacity - 5,035 M3 B. Scope Of The Swimming Pool Modernization (Renovation) Project: 1) Swimming Pool Hall Construction Works: - Pool Basin - Removal Of Existing Ceramic Linings And Replacement With Pool Porcelain, Sealing Of Installation Passages And Replacement Of Ceramics On The Swimming Pool Beach, As Well As Leveling Of Thresholds At The Overflow Gutter. Repair Of Damaged Swimming Pool Basin, Construction Of Tight Passages. - Renovation Of The Cloakroom Facilities. - Renovation Of The Electrical Installation In The Scope Of Renovation. - Repair (Roof Renovation). - Repair (Ceiling Renovation). - Adaptation Of The Main Entrance (From The Orlik Pitch Side) To The Requirements Of Disabled People. 2) Pool Water Technology • Optimization Of Swimming Pool Water Technology Using Existing Filters (If Their Technical Condition Inside, Especially The Nozzle Bottom, Complies With The Din Standard) With A Dosing Installation, Partial Replacement Of Piping, Sealing Of Passages, New Technological Infrastructure Of The Basins. Iii. Ventilation Of The Pool Hall • The Ordering Party Envisages The Implementation Of New Ventilation Using The Existing Ventilation Ducts. The Contractor Undertakes To Obtain All Permits Or Consents To Carry Out The Planned Renovation Or Construction Works Planned In The Project - According To The Ordering Partys Guidelines. The Study Should Include: 1) The Concept Of Land Development And Architectural And Construction Solutions In Two Variants - Preliminary Design Parts Necessary For The Functioning Of The Facility As A Whole: Possible Planting Of Trees And Shrubs), Water And Sewage Hydrants, Electrical Installations, Led Lighting, Photovoltaic Installation 4) Fire Safety Instructions, Design Of Evacuation Signs And Fire Protection Equipment. 5) Bill Of Quantities. 6) Investors Cost Estimate. 8) Energy Characteristics Operating Costs Of The Hall (Electricity, Heat, Costs Of Servicing Devices). 10) Equipment And Adaptations For People With Disabilities, Including Competitions For People With Disabilities, 11) Projects In Other Industries, If They Prove Necessary During The Design Process. 12) The Above-Mentioned Projects Should Be Developed In 4 Copies, The Cost Industry And Stwior In 3 Copies, And A Cd/Dvd Or Pendriver In 2 Copies Of All The Above. Documentation Elements - In A Modifiable Version (Extensions: Doc, Ath, Dwg) And Non-Modifiable (Extensions: Pdf); It Is Required That The Files Of The Electronic Version Correspond To The Files Of The Printed Version, The Drawings Contain The Designers Signatures And Other Elements Added To The Printed Version. 13) Submitting Complete Applications For
Contact Information
Address
Gmina Zebrzydowice,Zebrzydowice,43-410,Śląskie,Pl225 - Bielski
Email
ug@zebrzydowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112797875
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.