|
Full Civil Engineer With Additional Chargeslocal Administration, Mobilization And Demobilization, General Works Supervisor With Additional Chargeslocal Administration, Occupational Safety Technician With Additional Chargeslocal Administration, Surveyor With Additional Charges Local Administration, Surveyor Assistant With Additional Charges Local Administration, 05/07/2026 - 08:55:52, Night Watchman With Additional Chargeslocal Administration, Mobilization And Demobilization Of Work In An Urban Center Or Nearby Region With A Value Of Up To 1,000,000.00Local Administration, Mobilization And Displacement Of Teams, Equipment, Materials And Tools For Drilling Wells With Pneumatic Sonar Local Administration, Supply And Installation Of Work Sign With Galvanized Sheet And Wooden Structure. Af_03/2022_Pspreliminary Services, Construction Shed For Storage And Type-I Tooling, Internal Area 14, 52M2, Made Of Resin Plywood Sheet, Including Furniture (Small Work, Effective Up To 30 Men), Preliminary Der-Mgservices Standard, Conventional Work Location, Using Running Board Template Strokes Every 2.00M - 2 Uses. Af_03/2024Preliminary Services, Manhole (Height = 1.00 M And Balloon: Diameter = 0.60 M), Pcopasa 062/-, In Precast Concrete Rings P Copasa 104/- Sewage Treatment Installations, Manhole In Precast Concrete Rings With Internal Pocket And Steps - Additional Depth.Sewage Treatment Facilities, Cast Iron Cap Dn 600 T-109 Or T-48 (P-Copasa 107/ Or139/) - Layingsewage Treatment Facilities, Supply And Laying Of Rigid Pvc Pipe, Smooth Sewage Collector (Jei), Dn 100 Mm (4), Inclusive Connectionssewage Treatment Installations, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. Less Than 1.5 M, On Category 1 Soil, Locations With Low Level Of Interference. Af_09/2024Sewage Treatment Facilities, Mechanical Excavation In 1St Category Material, Including Loading On Truck, Exclusive Transport And Unloadingsewage Treatment Facilities, Supply Of Structural Concrete, Prepared On Site, With Fck 25Mpa, Including Laying, Densification And Finishingsewage Treatment Facilities, Transport Of Material Of Any Nature By Truck, Distance Greater Than 2Km And Less Than Or Equal To 5Km, Within The Urban Perimeter, Excluding Cargo, Including Unloading Sewage Treatment Facilities, Laying And Supply Of Pba Pvc Pipe For Water Network, Dn 100, Integrated Elastic Joint, Installed In A Location With High Level Of Interference (Includes Supply). Af_05/2024Sewage Treatment Installations, Supply And Laying Of Polypropylene Pipe (Ppr), Pressure Of 20 Kgf/Cm², Including Connections And Supports, D = 25 Mm (Nbr 15813)Sewage Treatment Installations, Base For Rectangular Manhole For Drainage, Masonry With Blocks Of Concrete, Internal Dimensions = 2.5X2.5M, Depth = 1.40 M, Excluding Buffer. Af_12/2020Sewage Treatment Facilities - Well 1, Addition For Rectangular Manhole For Sewage, 5M. Af_12/2020Sewage Treatment Installations, Excluding Buffer. Af_12/2020Sewage Treatment Facilities - Well 2, Circular Cover For Sewage And Drainage, Cast Iron, Internal Diameter = 0.6 M. Af_12/2020Sewage Treatment Facilities,
|