Excavation Of The Soil By Throwing It Aside With Excavators Of The Reverse Hopper Or Dragline Type With A Hopper Capacity Of 0.65 (0.5-1) M3, Soil Group: 4 (Lowering The Water Level By Means Of A Pump 125 M/H), Manual Digging Of Soil In Sloped Trenches Up To 2 M Deep Without Fasteners, Soil Group: 4 (Manual Digging After Excavator), Excavation By Moving The Soil To A Distance Of Up To 10 M, Power Of The Bulldozer: 96 (130) Kw (A.G.), 4Th Group Of Soil (Extraction Of Soil), Filling Pits And Ditches By Shifting The Soil Up To 5 M, Power Of Bulldozers: 96 (130) Kw (A.G.), 3Rd Group Soil (Reverse Casting, Quality Casting, Casting), To Add To Norm 01-01-034-03 During Each Subsequent 5 M Displacement Of The Soil, Construction Of Dams, Embankments, Dams, Screens And Lower Parts Of Dry Cores From Loose Soils With A Roller Weighing Up To 16 T (Compaction), 4Th Group Of Soil (Remaining Soil), Construction Of Retaining Walls And Basement Walls: From Butobeton (Stone-Concrete Retaining Wall B15, W4, F50), Sealing Of Seams During Fastening Of Slopes Of Channels With Prefabricated Reinforced Concrete Pans: With Hot Bitumen-Polymer Mastic (Heat Seams), Painting Insulation Of Vertical Concrete Surface: 2 Layers, With Diluted Bitumen (Parts In Contact With Underground Water)
Contact Information
Contact Person
Elşad Fərəcov
Address
Bakı ş. AZ1000, Hökümət Evi, mər. 5
Contact No.
+994 12 370 07 70 (601)
Email
elshad.ferecov@rsmx.gov.az
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112789514
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.