|
Work 1- Metal Manhole Without Traffic Interruption - D = 4.20M - Thickness 3.9Mm Galvanized Sheet - Excavated In 1St Category Material, Work 1- Loading, Maneuvering And Unloading Soil And Granular Materials In 10 M³ Dump Truck - Loading With Loader (Bucket From 1.7 To 2.8 M³ / 128 Hp) And Free Discharge (Unit: T). Af_07/2020, Work 1- Transport With 10 M³ Dump Truck, On Urban Road In Natural Bed (Unit: M3xkm). Af_07/2020, 9Mm Galvanized Sheet - Excavated From 3Rd Category Material, Maneuvering And Unloading Of Rubble In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ Bucket / 111 Hp) And Free Unloading (Unit: M3). Af_07/2020, Job 1- Electrowelded Steel Mesh - Supply, Preparation And Placement, Job 1- Concrete For Pumping Fck = 40 Mpa - Manufacture In 30 M³/H Batching Plant - Commercial Sand And Crushed, Job 1- Ca-50 Steel Frame - Supply, Job 1- Curved Plywood Forms Plasticized 10 Mm - General Use - Use Twice - Preparation, Installation And Removal, Work 1- Concrete Thickening Using An Immersion Vibrator, Work 1- Mechanical Casting Of Concrete With A Towable Pump With A Capacity Of 30 M³/H - Production In A 30 M³/H Dosing Plant, Work 1- Metal Manhole Without Interruption Traffic - D = 2.00 M - Galvanized Sheet - Excavated From 1St Category Material - Maximum Road Landfill = 5.40 M. 00 M - Galvanized Sheet - Excavated From 3Rd Category Material - Maximum Railway Landfill = 6.90 M, Work 1 - Dismantling The Sheets Of The Diâmtreo Pilot Tunnel 2.0M, Job 1- Shaft - Advance Well (Pv) D = 6.10M Galvanized Sheet And Thickness = 4.70Mm - Excavated In 1St Category Material, Job 1- Commercial Crushed Ballast - Mechanical Spreading, Job 1- Dry Shotcrete Fck = 30 Mpa Applied On Sloped Surfaces And Vertical, Project 1- Rachão Or Stone Produced By Hand, Project 1- Lean Concrete - Production In Concrete Mixer And Manual Throwing - Commercial Sand And Crushed, Project 2- Metal Manhole Without Traffic Interruption - D = 4, Project 2- Loading, Project 2- Transport With 10 M³ Dump Truck, Project 2- Steel Screen Electrowelded - Supply, Project 2- Concrete For Pumping Fck = 40 Mpa - Manufacture In 30 M³/H Batching Plant - Commercial Sand And Crushed Stone, Project 2- Ca-50 Steel Frame - Supply, Project 2- Curved Forms Of 10 Mm Plasticized Plywood - General Use - Double Use - Production, Project 2- Thickening Of Concrete Using An Immersion Vibrator, Work 2- Mechanical Casting Of Concrete With A Towable Pump With A Capacity Of 30 M³/H - Production In A 30 M³/H Dosing Plant, Work 2- Metal Culvert Without Traffic Interruption - D = 2, Work 2- Dismantling Of The Sheets Of The Diâmtreo Pilot Tunnel 2, Work 2- Shaft - Advance Well (Pv) D = 6.70Mm - Excavated In 3Rd Category Material, Work 2- Commercial Crushed Ballast - Mechanical Spreading, Work 2- Dry Shotcrete Fck = 30 Mpa Applied To Inclined And Vertical Surfaces, Work 2- Crack Or Hand-Produced Stone, Work 2- Lean Concrete - Production In A Concrete Mixer And Manual Laying - Commercial Sand And Crushed Stone, Work 2- Root Pile Drilled In The Rock With D = 40 Cm - Production, Work 2- Root Pile Drilled In The Ground With D = 50 Cm - Construction, Work 2- Materials For The Root Type Pile (Quantities Will Be Collected In The Project) - Supply Of Common Cement, Job 2- Materials For The Root Pile (Quantities Will Be Collected In The Project) - Supply Of Sand, Job 2- Materials
|