|
Construction Work – Development Of Large Investment Area Ig Hermsdorf Ost Iii, Lot 3 - Internal Development, Civil Engineering. Lot 3 - Internal Development, Civil Engineering General Services (Construction Site Equipment, Traffic Safety, Construction Site Clearance) Set Up, Maintain, Operate And Clear Construction Site For Overall Construction Project 1 Psch Set Up, Maintain, Operate And Clear A Self-Sufficient, Mobile Power Supply System 550 M Construction Fence 1 M High 900 M Construction Fence 2 M Height 26,500 M² Clear Construction Site 25,200 M² Construction Areas Gravel Construction 2,000 M² Construction-Time Access Roads Asphalt Construction 8,000 M³ Topsoil Work 2 Hours. Set Up, Maintain And Dismantle Long-Term Traffic Safety For L-Road 20,000 M² Mowing Property Areas, Removing Growth In Agricultural Areas Laying 400 M Dn 150 Drainage Pipes Sub-Object 2.1 Road Construction 290 M Peeling Off Shoulders 300 M Produce Shoulders 3,200 M³ Frost Protection Layers Up To Bk 3.2 3,300 M² Asphalt Areas Bk 1.8 For Access Roads Including On-Board Systems And Surface Drainage 1,600 M² Asphalt Areas Bk 3.2 For State Roads 700 M² Paving Surface Concrete Paving 1,200 M² Gravel Lawn 1,300 M Marking Work And Signage For State Road Junction Sub-Object 2.2 - Street Lighting, Civil Engineering 400 M Civil Engineering Work For Street Lighting Including Empty Pipe And Light Pole Foundations Sub-Object 2.3 - Traffic Signal System, Civil Engineering 280 M Civil Engineering Work For Traffic Signal System Junction Incl. Pole Foundations And Empty Pipe System Sub-Object 5.1 - Water Supply Systems 340 M³ Topsoil Work 2,500 M³ Earthworks Pipe Trenches Incl. Dewatering 1,250 M³ Soil Replacement 6,500 M² Shoring Work 1,025 M Pe 100 Rc Od 250 Drinking Water Pipe 420 M Pe 100 Rc Od 90 Drinking Water Pipe 25 Pieces Ggg - Fittings Dn 80 To Dn 200, Butterfly Valves, Fittings, Above And Below Ground Hydrants, Ventilation Fittings 1,350 M Rinsing, Disinfection And Pressure Testing Drinking Water Pipe Up To Dn 250 Sub-Object 5.3-Fire-Fighting Water Tank 1,750 M³ Soil Excavation For Construction Pits Including Dewatering 1,300 M³ Soil Exchange Material 2 Fire-Fighting Water Tanks Each 200 M³ Usable Volume In Prefabricated Construction Incl. Equipment Sub-Object 3.1 - Dirty Water Systems 330 M³ Topsoil Work 5,200 M³ Earthworks, Pipe Trenches Including Dewatering 3,410 M³ Soil Replacement 9,300 M² Shoring Work 1,200 M Sewer Pipe Dn 200 Pp 250 M Sewer Pressure Pipe Od 125 Sdr 11 Pe 17 St Reinforced Concrete Shafts Dn 1000 Sewer Pressure Pipe 1,200 M Cleaning, Leak Testing And Sewer Inspection Up To Dn 200 Sub-Object 4.1 - Rainwater Systems 640 M³ Topsoil Work 9,800 M³ Earthworks Pipe Trenches Including Dewatering 1,900 M³ Soil Replacement 9,200 M² Shoring Work 1,300 M Reinforced Concrete Pipes Dn 600 To Dn 1,400 90 M Pp Sewers Dn 300 16 St Reinforced Concrete Shafts Dn 1,000 To Dn 2,000, T Up To 4.00 M 1 Pc Of Shaft Structures T Up To 5.00 M 1,200 M² Asphalt Areas Bk 0.3 For Connecting Roads 3,000 M² Asphalt Base Layer For Rural Road Construction 2,000 M Of Shoulder Construction 625 M³ Earthworks For Drainage Trough Incl. Shafts And Connecting Pipes 1,300 M Cleaning, Leak Testing Etc
|