Paving And Asphalting Works - Development Area (Eg) District Heating 2026-2028 District Heating, Water Pipe, Fiber Optic Cable, Data Cable, Electricity / Wastewater And Renovation Of Manhole Covers/Paving And Ceiling Construction, Renovation Of Ssk Line. The Construction Site Is Located In The Urban Area Of Waldkraiburg. The Following Streets Are Affected: Peter-Rosegger-Straße/Goetheplatz, Dieselstraße/Porschestraße, Daimlerstraße Ba1 (Lindenthalstr.-Liebigstr.), Daimlerstraße Ba2 (Liebigstr.-Schilcherlinie), Daimlerstraße - Netzsch Connection, Industrial Area Teplitzer Straße/Traunreuter Straße Ba1, Anton-Günter-Weg 1-14 Ba1, Anton-Günther-Weg 22-48 Ba2, Von-Der-Tann-Straße/Aussiger Straße, Reichenberger Straße/Graslitzer Straße And Karlsbader Straße/Reichenberger Straße. After The Geothermal Source Has Been Put Into Operation, The Aim Of Stadtwerke Waldkraiburg Gmbh Is To Develop The City Of Waldkraiburg And The Industrial Area Thermally By Installing A Comprehensive District Heating Network. The Subject Of This Tender Is The Development Area 2026 - 2028, Which Builds On Existing Network Sections. The Forecast District Heating Route Length Is Approx. 7346 M Including House Connections. Parallel To The Laying Of The District Heating Lines, Other Service Providers (Electricity, Water, Fiber Optic Cables, Control Cables) Are Also Planned To Be Laid In Various Route Sections. As Far As Possible, The Installation Is Carried Out Together With The District Heating Pipeline; Otherwise, A Separate Pipe Trench Is Created After Mutual Agreement. The Planned Services Are Advertised In The District Heating Main Line, District Heating House Connection, Water Supply Main Line, Water Supply House Connections, Fiber Optic Cable, Data Line And Electricity As Well As Paving And Asphalt Work For The City Of Waldkraiburg. Offers Must Be Submitted For All Trades. The Construction Services Described Here Can Only Be Carried Out Together And From A Single Source. Incomplete Offers Are Inadmissible And Will Not Be Evaluated. Separate Invoices Must Be Created For The Specified Trades (See Point 13 Structure Of The Invoices). The Areas And The Exact Scope Of The New Division Lines To Be Laid Are Designated By The Respective Division Authorities. Construction Supervision Is Also Subject To The Respective Divisional Authorities Or The Engineering Office Commissioned For This Purpose. The Pipe Trench Is Billed Separately For Each Trade (Firepower, Electricity And Water, Wastewater) According To The Standard Cross-Section. The Data And Fiber Optic Cables Are Laid In The District Heating Trench. If There Are Positions That Are Not Covered In A Trade, These Are Taken From The Main List Of Services For District Heating Supply Lines Or From The List Of Services For Water Supply. The Executing Company, Its Subcontractors Or The Personnel Deployed On The Construction Site Must Submit The Relevant Approvals Or Certificates In Accordance With Dvwg (W 1 In Accordance With Worksheet Gw 301) And Agfw (Fw 02 In Accordance With Worksheet Fw 601) When Submitting The Offer. On Every Construction Site (Column), The Site Manager, Foreman And The Column Leader As Well As The Foreman Must Carry The Following Identification Card With Them. The Id Cards Must Be Presented As Proof Before Construction Begins. (Minimum Requirement For Site Manager, Police Officer
|