1. The Subject Of The Order Are Construction Works Including The Execution Of The Task Entitled: Construction Of A Warehouse In Jrg Wodzisław Śląski Based On Design Documentation Prepared By Lasok Architekci Andrzej Lasok From Wodzisław Śląski And The Decision On Construction Permit No. 0937/25 Of December 17, 2024 And The Certificate Of No Objection No. Wab.6743.3.0011.2026 Of February 25, 2026, Reporting The Demolition Of A Farm Building.2. The Scope Of Works Includes: 1) Demolition Works: - Demolition Of Concrete, Masonry And Reinforced Concrete Elements, - Demolition Of Concrete And Bituminous Surfaces Together With The Sub-Base, - Dismantling Of Part Of The Fence Together With The Dismantling Of Foundations, - Demolition Of The Farm Building, 2) Construction Works: - Earthworks, - Making The Sub-Base From Crushed Aggregate, - Planning The Soil From Excavations, - Making Footings And Foundation Footings, - Assembly Prefabricated Reinforced Concrete Channel With Moisture-Proof Insulation, - Erection Of Foundation Walls From 25 And 38 Cm Thick Concrete Blocks, - Execution Of Horizontal And Vertical Moisture-Proof Insulation Of Footings, Foundation Footings And Foundation Walls, - Backfilling And Simultaneous Compaction Of The Space Between The Foundation Walls, - Construction Of Sewage Approaches, - Construction Of A Reinforced Concrete Slab On The Ground, - Construction Of Ground Floor Walls From Ceramic Blocks With 25 And 38 Cm Thick, - Concreting Of Columns From The Foundation Level To The Lower Level Of Gate Lintels And Ring Beams, - Concreting Of Gate Lintels And Ring Beams, - Installation Of Steel Joists And Steel Rafters, - Erecting Attic Walls From Ceramic Blocks 19 Cm Thick, - Concreting Of Columns And Ring Beams In The Area Of Attic Walls, - Installation Of Roof Sandwich Panels And Skylights In The Roof Plane, - Installation Of Substructures For Sheet Metal Processing Of Attic Walls, - Thermal Insulation Of Attic Walls From The Roof Covering Side, - Waterproofing Of Attic Walls, - Installation Of Sheet Metal Flashings And Gutters, - Installation Of Roof Fans, - Installation Of Internal Sanitary And Electrical Installations, - Installation Of Central Heating Installations In The Form Of Water Heaters, - Connecting The Central Heating Installation To The Social Room No. 02 And Installing A Radiator, - Installation Of Internal Cement And Lime Plasters, - Installation Of Insulation Damp-Proof Slab On The Ground, - Installation Of Linear Floor Drainage, - Installation Of Thermal Insulation Of The Slab On The Ground, - Construction Of The Hall Floor With Hardening Backfill, - Installation Of Sectional Gates With Wicket And Service Doors (Air Permeability Class 4, Water Tightness Class 3, Resistance To Wind Loads Class 3 According To Pn-En 13241), Glazing Area Approx. 2 M2, - Installation Of External Thermal Insulation Of Foundation Walls, - Installation Of Stoneware Tiles In The Plinth Area, - Installation Of Thermal Insulation Of External
|