|
The Subject Of The Order Is The Performance Of Construction Works Including The Implementation Of The Task Entitled: Renovation Of Two Bus Bays At Ul. Construction In Tychy, In Accordance With The Material Scope Specified In The Cost Estimate, Simplified Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb). The Scope Of The Order Includes The Performance Of All Basic, Accompanying And Auxiliary Works Necessary For The Correct And Complete Implementation Of The Investment.1. Material Scope Of The Order 1.1. Preparatory And Organizational Works, Including: • Organization And Development Of The Construction Site, • Development And Implementation Of Temporary Traffic Organization, Including Preparation And Subsequent Demolition Of Temporary Stops, • Geodetic Marking Of The Works, • Ensuring Industry Supervision, • Introducing And Maintaining Temporary Signage, • Inspection Report, Including Ediom.1.2. Demolition Works, Including: • Demolition Of Existing Surfaces: Bays, Platforms And Sidewalks • Dismantling Of Road Elements And Infrastructure Colliding With The Investment, • Loading, Transport And Disposal Of Demolition Materials In Accordance With Applicable Regulations.1.3. Earthworks, Including: • Excavation And Trenching For Pavement Structures, • Profiling And Compaction Of The Subgrade, • Possible Supplementation Of The Foundation.1.4. Pavement Structures, Including: • Execution Of Auxiliary And Basic Bases, • Execution Of Pavement Structural Layers (In Accordance With The Technology Indicated In The Cost Estimate And Stwiorb), - Surface Made Of Light Gray Concrete Cubes - Sidewalk - Surface Made Of Dark Gray Concrete Cubes - Platform - Concrete Surface - Bays, - Filling On Bituminous Surface Along The Retainers. 1.5. Road And Finishing Elements, Including: • Installation Of Concrete And Polymer Concrete Platform Curbs, Stops And Edges, The Platform Curb Should Be Built To A Height Of 16 Cm. • Vertical Adjustment Of Underground Facilities (Manholes, Inlets, Valves), • Height Adjustment In Relation To The Designed Grade Line, Including Bus Shelters, Abutments, Layout Boards, • Area Reconstruction Works Adjacent.1.6. Technical Infrastructure, Including: • Possible Protection Of Existing Networks.1.7. Clean-Up And Completion Works, Including: • Tidying Up The Construction Site, • Restoring The Area To A State Consistent With The Documentation, • Performing An As-Built Geodetic Inventory, • Providing The As-Built Documentation To The Ordering Party. A Detailed Description Of The Order And The Method Of Its Execution Is Specified In The Bid Cost Estimate And Technical Documentation, Developed For The Purposes Of This Order, Constituting Annexes No. 2 And 3 To The Swz, Respectively.
|