|
Sp No. 10 - Renovation Of Sanitary Facilities, Central Heating And Water And Sewage Installations. The Subject Of The Order Is The Replacement Of The Hot Water Installation And The Internal Water And Sewage Installation. Within Sanitary Facilities And Fire Protection Water Supply Installations At Primary School No. 10 In Głogów At Ul. Andromeda 62 (Register No. 17/1, Precinct 0018 Kopernik) Along With The Renovation Of Sanitary Facilities, Delivery And Installation Of Equipment In Accordance With The Technical Design Attached To The Procedure. The Scope Of Work Will Include, Among Others: Construction Industry Renovation Of Womens, Mens And Teachers Sanitary Facilities (Ground Floor, 1St Floor, 2Nd Floor) Includes, Among Others: - Dismantling Works (Including, Among Others, Dismantling Walls, Removing Steel And Wooden Door Frames, Dismantling Floors, Dismantling Wall Coverings, Removing Ventilation Grilles, Scraping And Washing Off Old Paint, Etc.), - Construction Works (Including Drilling, Grooving, Concreting Holes, Filling Plasters, Priming, Double-Layer Wall And Ceiling Plasters, Double Painting, Wall Facing Tiles, Gluing Mirrors, Installing Ventilation Grilles, Installation Of Internal Doors, Tile Floors, Installation Of Walls And Panel Partitions, Installation Of Sidelights). Construction Works On Replacing The Hot Water Installation (Basement, Ground Floor, 1St Floor, 2Nd Floor) Include, Among Others: - Construction Works Necessary To Replace The Central Heating Installation. Construction Works Related To The Replacement Of The Fire Protection System (Basement, Ground Floor, 1St Floor, 2Nd Floor + Gym) Include, Among Others: - Construction Works Necessary To Replace The Fire Protection System. Electrical Industry Work On The Electrical Installation Of Womens, Mens And Teachers Toilets (Ground Floor, 1St Floor, 2Nd Floor) Includes, Among Others: - Replacement Of Cabling And Accessories With New Ones (Including Wires, Lighting Fixtures, Plug Sockets, Switches, Etc.), - Electrical Measurements. Sanitary Industry Works On The Hot Water Installation (Basement, Ground Floor, 1St Floor, 2Nd Floor) Include: - Replacement Of The Piping With New Ones, - Disassembly Of Cast Iron Radiators With Equipment And Installation Of New Column Radiators With Equipment, - Tightness Tests And Commissioning Of The Regulated Installation. Works On The Water Supply And Sewage Installation In Sanitary Facilities (Ground Floor, 1St Floor, 2Nd Floor) Include Including: - Replacing The Piping With New Ones And Constructing Dedicated Approaches To The Fittings And Passages Through The Construction Walls, - Incorporating The Designed Installation Into The Existing Water Supply Line, - Connecting The Sewer Lines With Outlets Above The Roof And Exhaust Vents, - Replacing Sanitary Devices With Fittings (Toilet Bowls, Washbasins, Urinals), Fittings With Instrumentation (Faucets, Siphons, Valves, Etc.), - Tightness Tests And Commissioning Installation. Works On The (External)
|