1. The Order Includes The Execution Of Works In Accordance With The Design Documentation And The Technical Specification For The Execution And Acceptance Of Works. The Investment Planned For Implementation Is The Reconstruction Of District Road No. 3109E Over A Length Of 2.5 Km, Including A Section That Is An Extension Of Ul. Żeromskiego In Drzewica And Running Through The Entire Village Of Dąbrówka.2. Sources Of Financing: The Order Is Co-Financed By The Government Road Development Fund. The Ordering Party Pursuant To Art. 310 Of The Public Procurement Act May Invalidate The Contract Award Procedure If The Funds That The Ordering Party Intended To Allocate To Finance All Or Part Of The Contract Under The Above-Mentioned Sources Of Financing, Were Not Granted To Him.3. Detailed Description Of The Subject Of The Order: The Detailed Scope Of Work Planned For Implementation Includes The Works Indicated In The Bill Of Quantities. The Scope Of Road Reconstruction Includes Widening The Road To A Width Of 6 M, Strengthening The Existing Surface And Installing A New Wearing Course. Construction Of A One-Sided Pedestrian Sidewalk Made Of Concrete Cubes. Construction Of Concrete Road Ramps (To Properties Located On The Sidewalk And To Developed Properties Located On The Roadside) And Aggregate Ramps To Undeveloped Properties. Construction Of Roadsides Reinforced With Aggregate. Drainage Includes Desilting And Profiling The Road Ditch On The Right Side, And Covered, French Ditches Are Designed In Places Where The Road Lane Is Narrowed. In Terms Of Marking, Thick-Layer Horizontal Marking Will Be Made, As Well As Replacement And Supplementation Of Vertical Markings, In Accordance With The Developed Permanent Traffic Organization Project. In Addition, The Contractor Will Mark The Works In Accordance With The Temporary Traffic Organization Project Prepared By Him And Approved, And Will Provide Surveying Services - Designation Of The Main Points Of The Facility, Maintenance During Implementation And As-Built Inventory Along With A List Of Ground Changes. The Contractor Is Obliged To Keep Entries In The Construction Log. These Costs Are Not Subject To A Separate Payment And Will Be Included In The Offer Price. The Contractor Is Obliged To Secure Surveying Points While Performing The Works. In Case Of Destruction, He Is Obliged To Recreate Them At His Own Expense. Useful Demolition Materials Are The Property Of The Ordering Party. The Contractor Is Obliged To Manage Them In Accordance With The Design Documentation. After Cleaning, Transport The Remaining Useful Materials To The Road And Bridge Circuit Square In Opoczno And Place Them In An Orderly Manner In The Indicated Place. The Suitability Of The Materials Will Be Assessed By The Supervisory Inspector In Consultation With The Ordering Party. Trees Cut Down Are The Property Of The Ordering Party. The Contractor Is Obliged To Take Them To The Site Of The Road And Bridge Circuit In Opoczno And Place Them Sorted I
Contact Information
Address
Powiat Opoczyński Reprezentowany Przez Zarząd Powiatu Opoczyńskiego,Opoczno,26-300,Łódzkie,Pl713 - Piotrkowski
Contact No.
447414900
Email
zamowienia_publiczne@opocznopowiat.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112748454
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.