|
The Subject Of The Order Is The Performance Of Renovation, Construction, Finishing And Installation Works At The Tor-Tor Ice Rink. Józefa Stogowski In Toruń At Ul. Gen. J. Bema 23/29, Including The Renovation Of Communication Routes, Entrance Areas, Selected Rooms Of The Ice Rink And Public Toilets, Including Rooms Intended For People With Disabilities.1) The Scope Of The Order Includes In Particular: A) Entrance Stairs In Front Of The Building, Including Demolition Of Existing Cladding And Insulation, Execution Of Repair And Leveling Layers, Repair And Sealing Of Expansion Joints, Construction Of New Cladding Of Stone/Granite Slabs With The Following Properties: Anti-Slip And Frost-Resistant, Installation Of System Doormats And Cleaning And Painting Of Balustrades. B) Entrance Hall, Including Demolition Of Existing Floors, Preparation And Leveling Of The Subfloor, Installation Of New Floors, Disassembly And Replacement Of Indicated Joinery Elements, Display Windows And Doors (4 Hinges Per One Leaf), Construction Of Column Casings And Finishing Works On Walls. C) Toilet Rooms And Bathrooms, Including Mens And Womens Toilet Rooms And Rooms Intended For People With Disabilities, Including Demolition Works, Execution Of Floors And Wall Cladding, Moisture-Proof Insulation, Suspended Ceilings, Door Joinery (Gray Pvc Doors, 4 Hinges Per One Leaf), System Walls, Sanitary And Electrical Installation Works, Replacement Of Radiators, Installation Of Fans And Installation Of Sanitary And Bathroom Equipment. D) Corridors And Communication Zones Of The Ice Rink, Including Breaking Existing Rubber Floor Coverings, Milling And Preparation Of The Substrate, Execution Of Leveling Layers, Construction Of New Roll Carpets Made Of Flame-Retardant Sbr Rubber With A Thickness Of 6 Mm, Welded And Glued To The Surface, Painting Of The Paneling, Replacement Of The Indicated Radiators And Accompanying Works. Assembly Room.F) Skate Rental Room, Painting, Replacement Of Floors, Replacement Of Shelves For Skates.G) Accompanying Works, Including Securing The Work Site, Organization Of Facilities, Securing Active Parts Of The Facility, Waste Removal And Disposal, Tidying Up The Work Area, Carrying Out The Required Tests, Checks, Measurements, Acceptance And As-Built Documentation, And Submitting Documents Confirming The Quality Of The Materials Used. All Works Should Be Performed In Accordance With Swz, Stwiorb, Technical Description, Bill Of Quantities In The Auxiliary Scope, Principles Of Technical Knowledge, Applicable Regulations And Instructions Of The Supervisory Inspector Or Representative Of The Ordering Party.2) The Contractor Will Implement The Subject Of The Contract To The Extent And In The Manner Specified In The Technical Description And Technical Specification For The Execution And Acceptance Of Construction Works (Studies Prepared By The Construction Investment Design Office Jagodziński Projekt Ryńsk And Staimat Tomasz Lewandowski) Components Of The Design Docu
|