The Subject Of The Order Is The Construction Of Ul. Ogrodowa In Wyszków, Approx. 230 M Long, Including The Construction Of A Rainwater Drainage System And The Reconstruction Of Conflicts With The Power And Telecommunications Networks, Including: 1) Preparatory Works; 2) Curbing; 3) Construction Of A Road Approx. 230 M Long With A Surface Made Of Concrete Paving Stones - 1,086.36 M2; 4) Construction Of Exits With A Surface Of Concrete Paving Stones - 112.06 M2;5) Roadsides Made Of Crushed Aggregate - 291.85 M2;6) Construction Of Permanent Traffic Management;7) Construction Of A Rainwater Drainage System: A) Channels Made Of Pvc Sn12 Pipes Ø315 Mm Or Double-Layer Pp Sn12 Pipes Ø315 Mm - 168.50 M;B) Channels Made Of Pvc Sn12 Pipes Ø250 Mm Or Double-Layer Pp Sn12 Pipes Ø250 Mm - 69.20 M;C) Channels Made Of Pvc Sn12 Ø200 Mm Pipes - 27.50 M;D) Concrete Wells Ø1200 Mm With A Relief Ring And A D400 Class Manhole - 8 Pcs.;E) System Sewage Chambers Ø425 Mm - Inlet Street With Settling Tank 100 Cm – 8 Pcs.; 8) Reconstruction Of The Collision With An Overhead Power Line; 9) Reconstruction Of The Telecommunications Line; 10) Reconstruction Of The Above-Ground Hydrant. The Detailed Scope Of Works Is Specified In The Stwior Design Documentation Constituting Annex No. 10 To The Swz And The Bills Of Quantities Constituting Annex No. 9 To The Swz. Notes: 1) The Detailed Scope Of Works Is Specified In The Design Documentation, Stwior And The Bills Of Quantities.2) The Documentation Contains A Broader Range. The Order Covers The First Stage Of A Road With A Length Of Approx. 230 M - A Drawing With The Scope Is Attached As Annex No. 12 To The Swz3) At Each Request Of The Ordering Party, The Contractor Will Present To The Ordering Party A Cost Estimate Prepared Using The Detailed Calculation Method, Consistent With The Unit Prices And Price Factors Given In The Offer.4) When Carrying Out The Works, The Contractor Is Obliged To Ensure Permanent Access To All Properties Adjacent To The Road.4.3 Equivalent Solutions: In Each Case Used In The Description Of The Item Ordering Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Design Documentation, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or Technical Specifications For The Execution And Acceptance Of Works, It Means That They Are Provided As Examples And Specify Only The Minimum Expected Quality Parameters And The Required Stan
Contact Information
Address
Gmina Wyszkow,Wyszków,07-200,Mazowieckie,Pl924 - Ostrołęcki
Contact No.
297424201
Email
zamowieniapubliczne@wyszkow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112733401
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.