Tenders Are Invited For Electrical Installation Work – Pwa.T4 Tender Documents For Electrical, Low-Voltage I ... in Switzerland
Tender Notice
TenderID
112730452
Tender Brief
Tenders Are Invited For Electrical Installation Work – Pwa.T4 Tender Documents For Electrical, Low-Voltage Installations (Construction Cost Plan Bkp 236)
Electrical Installation Work – Pwa.T4 Tender Documents For Electrical, Low-Voltage Installations (Construction Cost Plan Bkp 236). Zurich Airports Infrastructure Is Undergoing A Gradual Renewal Process. In The Last 15 Years, Various Parts Of The Central Airport Infrastructure Have Been Extensively Renovated And Expanded: Dock B Was Completely Rebuilt, Terminal 2 Was Completely Renovated And Expanded, And The New Security Control Building With Centralized Access To The Airside Center Was Built Between Terminals 1 And 2. The Central Baggage Sorting System North Of Terminal 1 Is Currently Being Expanded And The Airport-Wide Baggage Sorting System Is Being Replaced And Renewed. In The Next Step, The Aging Parts Of The Central Airport Infrastructure Must Be Replaced: Dock A, Together With The Tower, Was Put Into Operation In 1985 And Its Structure Has Remained Largely Unchanged To This Day. In Terms Of Functionality, Sustainability And Quality, Dock A Can No Longer Meet Todays Requirements. Based On A Comprehensive Analysis, It Was Decided To Replace The Existing Dock A With A New Building North Of The Current Building. The Replacement Building For Dock A, The New Tower And The Extensively Renovated Apron To Dock A With All Further Adjustments, Expansions And Conversions Of The Central Airport Infrastructure Are The Most Important Structural Measures Of The Next 15 To 20 Years. During Phased Implementation, It Must Be Ensured That Operations Can Continue As Normal And That Future Functional Requirements Can Be Met With The Newly Constructed Buildings. The Pwa “Perimeter Exposure Root A” Project Includes The Implementation Of Adjustments To Existing Media And Systems. These Are Located In And Outside The Demolition Perimeter Of Wurzel Dock A. The Work Is To Be Carried Out For The Construction Phase Of The Dismantling And For The Further Phases Of The Main Airside Project In The Period From 2026-2033. Essential Parts Of The Building Technology For Supplying The Control Tower, Dock Root A, Dock A, Airside Center And The Passport Control Hall Are Located In The Demolition Perimeter Of Dock Root A. The Pwa.T4 Subproject Described Here Is About The Network For Ict And The Associated Low-Voltage Systems (Fiber Optic Cables And Copper Cables, E.G. For Telephony, Trunked Radio, Mobile, Etc.). All Media That Run Through Root Dock A In The Existing Building Must Be Relocated And Dismantled, Which Is Why Various Temporary Relocations Are Necessary. This Requires Several Steps To Be Carried Out One After The Other, Which Is Why The Project Is Further Divided. The First Step (Pwa.T4.1) Realizes An Autonomous Dock A (A20). In The Further, Future Steps (Pwa.T4.2 To Pwa.T4.4), The Media In The Inner Media Channel And In The Flusi Channel Must Be Relocated Because They Have To Make Way For The Dtw Project At A Later Date. The Subject Of This Call For Tenders Is The Sub-Project Pwa.T4 Network For Ict And
Contact Information
Address
Postfach
Contact No.
+41438167492
Email
anigna.locher@zurich-airport.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112730452
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.