Work Shall Include The Supply And Installation Of A New Bridge Culvert Over Blueberry Creek, Located 8 Km Northeast Of Leslieville (Se 18-40-4-W5m). The Contractor Shall Install A 2.7 M Diameter Csp Culvert By 28 M Invert Length As Per The Design Sketch And Section 18 Of The Standard Specifications For Bridge Construction. The Culvert Will Be Located On A 9-Degree Rhf Skew To The Local Road, Centred At Station 5+550.000. The Scope Of The Work Includes, But Is Not Limited To, The Following: − Traffic Accommodation − Site Isolation, Turbidity Monitoring, And Fish Capture And Release − Demolition And Disposal Of Bridge Structures − Excavation, Including Geotextile Filter Fabric − Supply And Assembly Of Culvert Materials − Backfill, Including Backfill Material Testing − Heavy Rock Riprap Erosion Protection − Roadway Work − Permanent Environmental Protection Devices
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112675262
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.