Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Siding With Metallic Tile. Af_03/2024, Electricity Input, Overhead, Three-Phase, With Recessed Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020, Temporary Water And Sewage Connection, Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, 05/05/2026 - 12:22:06, Fnde 244 Local Administration Type 1 (Un), Rental Of Container 2, 30 Mobilization/Demobilization), Without Internal Dividers And Without Toilet (Does Not Include Mobilization/Demobilization), For Toilet, With 4 Basins, 8 Showers, 1 Washbasin And 1 Urinal (Does Not Include Mobilization/Demobilization), Mechanized Cleaning Of Vegetation Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), With Crawler Tractor. Af_03/2024, Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity: 0.8 M³ / Power: 111 Hp), Width Up To 2.5 M, Depth Up To 1, With Clay-Sandy Soil. Af_08/2023, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placing Formwork). Af_01/2024 - Earthmoving, Mechanized Excavation For Baldrame Beam Or Running Shoe With Mini-Excavator (Including Excavation For Placing Formwork). Af_01/2024 - Earth Moving, Preparation Of Trench Bottom Width Less Than 1.5 M (Natural Soil Adjustment). Af_08/2020 - Earth Moving, Mechanized Trench Backfilling With Skid Steer Loader, With Percussion Soil Compactor. Af_08/2023 - Earth Moving, Mechanized Trench Backfilling With Skid Steer Loader, Mechanically Excavated Pile, Without Stabilizing Fluid, 40Cm In Diameter, Concrete Placed By Concrete Mixer Truck (Exclusive Mobilization And Demobilization). Af_01/2020_Pa, Mechanical Leveling Of Reinforced Concrete Pile, Diameters Of Up To 40 Cm. Af_05/2021, Ballast With Granular Material, Application In Crowning Blocks, Thickness Of *5 Cm*. Af_01/2024 - Concret. Armad. Footings, Thin Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024 - Concrete Arm. For Shoes, Manufacture, Assembly And Disassembly Of Shoe Formwork, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024 - Concret. Armad. Footings, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024 - Concr. Armad. Footings, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024 - Concrete Arm. Footings, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024 - Reinforced Concrete. Footings, Footing Concrete, Fck 30 Mpa, Using Pump - Laying, Densifying And Finishing. Af_01/2024 - Reinforced Concrete. Shoes And Blocks, Thickness Of *5 Cm*. Af_01/2024 - Concret. Armad. For Blocks, 5 Cm Thick. Af_01/2024 - Concrete Arm. For Blocks, Assembly And Disassembly Of Formwork For Crowning Block, 4 Uses. Af_01/2024, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2
|