Tree-Cutting Services – Tree Cutting And Branching Works On Bkv Traffic Lines. It Is Not Possible To Select A Cubic Meter Unit For The Quantity Data Entered In The Bt-25 Field, Therefore The Data Entered In Meters In The Bt-25 Field Is Understood In Cubic Meters. Carrying Out Tree Felling And Branching Works At The Traffic And Power Supply Locations Of Trams, Trolleybuses And Gear Vehicles Within The Framework Of A Business Framework Contract. Total Quantity (Planned): 8,586 M3/24 Months (The Unit Of Measure Specified In Field Bt-25 Is In Cubic Meters) The Total Quantity, The Unit Of Measure Of The Unit Prices And The Basis Of Settlement Is Not The Loose/Leafy, But The Compressed Quantity In M3 After Debranching But Before Shredding, Assembled For Delivery. It Is Detailed In The Price Table And The Technical Description. The Quantities Given In The Price Table Have Been Determined For 12 Months Based On Previous Usage Experience, So-Called Empirical Quantities. The Experimental Quantities Have Been Given For The Purpose Of A Well-Founded Assessment Of The Offers, To Determine The Total Offer Price Without Vat, The Quantities Procured Under The Contract May Differ From These Experimental Data. The Bidder Must Submit His Bid In The Knowledge Of The Above. Only The Unit Prices Are Indicated In The Annex To The Contract To Be Concluded. The Tenderer Undertakes To Issue An Order Equal To 70% Of The Framework Amount To Be Recorded In The Framework Contract. The Tenderer Draws Attention To The 321/2015. (X. 30.) To The Provisions Of Section 46 (3) Of The Government Decree. The Tenderer Draws Attention To The 235/2024. (Viii. 8.) To The Provisions Of The Government Decree. The Tenderer Must State In His Offer, Duly Signed, That: • In Case Of Winning, He Will Have The Tools, Target Machines, Assembly Materials And Specialists Necessary For The Proper Execution Of The Work To Fulfill The Contract; • In The Event Of An Emergency, No Later Than When The Order Is Issued.... Starts The Work Within An Hour (Disembarkation Time) And Finishes It Within 2 Calendar Days) (The Tenderer Evaluates The Offer Given For The Start Time Undertaken In The Event Of An Emergency Separately); • In Case Of Winning, Until The Conclusion Of The Contract - At The Latest At The Time Of The Conclusion Of The Contract - Take Out General Liability Insurance With Limits Of At Least 20 Million Huf/Year And 5 Million Huf/Damage Or Extend Your Existing Liability Insurance, And You Will Also Have Valid Liability Insurance Of The Extent And Scope Prescribed In This Clause During The Performance Of The Contract. • Acknowledges That If, In The Event Of Winning, It Does Not Take Out Liability Insurance Of The Required Extent And Scope By The Date Of The Conclusion Of The Contract At The Latest, Or Does Not Extend Its Existing Liability Insurance In Accordance With The Requirements Of The Bidder, The Bidder Will Be Liable For This In Accordance With Kbt. It Is Evaluated As A Withdrawal From The Conclusion Of The Contract According To § 131, Paragraph (4); • Undertakes To Compensate The Damage Resulting From The Error In Case Of Faulty Performance During The Work; • Commits To A Maximum Of 2 Calendar Days In The Event Of A Defect Arising Under The Warranty
Contact Information
Contact No.
+36 14616578
Email
kozbeszerzes@bkv.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112664385
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.