Construction Work – Accessibility Of The M1 Hegyeshalom Border Crossing I.. Accessibility Of The M1 Motorway Hegyeshalom Border Crossing - Phase I: Implementation Of A 2X2 Lane Road Crossing At The Site Of The Demolished Central Building. In Phase I Of The Accessibility Of The Border Crossing, A 2X2 Lane Crossing Of The Highway Must Be Implemented At The Site Of The Demolished Central Buildings, With The Creation Of Essential Surfaces For The Purpose Of Border Police Checks, And The Implementation Of The Elements To Be Established In The Next Phases For The Final Construction, Which Cross The Highway And Are Located In The Dividing Lane. In Order To Carry Out The Task, It Is Necessary To Develop The Relevant Construction Plans Based On The Available Permit Plans, Based On Which The Direct, Straight Passage Of The 2X2 Lane Would Be Implemented In The Dividing Lane By The Construction Of A New Road Base And Track Structure, As Well As By The Piling Of The Crossing Reversing Structure - Which Has Not Yet Been Implemented In Phase I - At The Site Of The Demolished Central Building. The Elements That Will Not Be Implemented In Phase I (Road Reversing Overpass Structure, One Toilet Building On Each Side And Infrastructure Elements Suitable For Complex Inspections Such As A Covered Checkpoint, Office Building And Parking Spaces, One Complex Rest Area On Each Side With Gas Station Space Guarantee, A Service Center On The Inbound Side Leading To Budapest, And An Autohof Type Truck Parking Lot On The Outbound Side Leading To Vienna) Are Necessary For The Later Implementation Of Utilities And It Is Also Necessary To Implement The Highway Crossings Of The Drainage System, So That The Traffic On The Highway Is Not Obstructed By These Works When They Are Finally Built. The Construction Of The Drainage System, The Recultivation Of The Demolished Asphalt Surfaces And The Implementation Of Traffic Technical Elements Are Also Part Of The Task. - The Construction Of A 2X2 Lane Highway With A Total Length Of 1,200 Meters, As Well As - The Construction Of The Foundations Of A New National Road Bridge With A Total Span Of 26.4 Meters. Other Main Quantities/Tasks: - Preparation Of Construction Plans Based On The Authorization Plans For The Project Realized With Only 2X2 Traffic Lanes; - Creation Of A 2X2 Traffic Lane With Stopping Lanes; - Establishment Of Border Police Control Areas; - The Design Of The Pillar Foundation Of A Crossing Structure Located In The Dividing Strip; - The Construction/Location Of Utilities Crossing The Main Road; - Building A Drainage System; - Placement Of Traffic Engineering Equipment; - Recultivation Of Demolished Structures/Paved Surfaces. The Investment Is Subject To A Permit, Bp/0801/00667-24/2024 Issued On October 7, 2024 By The National Road And Shipping Department Of The Budapest Capital Government Office. Road Construction Permit No. Is Available. It Needs To Be Modified Due To The Partial Core Implementation. In Addition To Public Areas, The Project Also Affects Two Privately Owned Areas (Hegyeshalom 018/18, 018/19 Hrs.). These Are Being Acquired, And The Handover Of The Work Area Is Expected To Take Place In May 2026. According To The Building Permit, The Earthworks Are Only Continuous Archaeological Work
Contact Information
Address
Alkotmány Utca 5
Contact No.
+36 14354833
Email
kozbeszerzes@ekm.gov.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112664325
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.