Engineering Design Services – Documentation Pn. „Reconstruction Of The Bed Of The Liva River At Km 0+000-30+825 Oraz Left Flood Shaft At Km 26+375-29+921, Gm. Ryjevo, Gm. Kwidzyn, Gm.. 1. The Subject Of The Order Is The Service Called Documentation Entitled Reconstruction Of The Liwa River Bed At Km 0+00030+825 And The Left Flood Embankment At Km 26+37529+921, Ryjewo Commune, Kwidzyn Commune, Kwidzyn Commune, Kwidzyn Poviat, Pomeranian Voivodeship. The Task Is To Develop Design Documentation Along With Obtaining All Necessary Opinions, Arrangements, Permits And Decisions Enabling Investor Supervision And Ordering Construction Works Related To The Task Being Performed. As Part Of The Study, Consents And Permits Necessary To Implement The Investment Consisting In The Reconstruction Of The Longitudinal And Transverse Section Of The River And The Flood Embankment In The Indicated Section, Reconstruction Of The Quays And Infrastructure, Proposed By The Contractor And Approved By The Ordering Party, Must Be Obtained. The Project Should Include The Determination Of The Coastline Based On A Decision Of The Ministry Of Infrastructure, Along With The Geodetic Separation Of Plots Belonging To The Liwa River - To Be Taken Over By The Polish Waters State Water Holding. The Design Should Include The Necessary Bank Reinforcements, How To Introduce Rainwater And Other Watercourses Into The River, Etc., Along With Detailed Solutions. 2. The Subject Of The Order Referred To In Point 1 Includes: 1) Execution Of The Basic Order (Hereinafter Referred To As: Basic Order Or Basic Task): The Basic Tasks Of The Contractor Include: - Performance Of Preparatory Work Related To The Task In Question. The Detailed Scope Is Described In Chapter V, Point. 1 Opz (Appendix No. 1 To Swz), - Preparing Documentation Together With Decisions, Consents And Other Elements Necessary To Obtain A Decision On Environmental Conditions, And Obtaining This Decision, - Preparing Documentation Together With Decisions, Consents And Other Elements Necessary To Obtain A Decision On The Location Of A Public Purpose Investment, And Obtaining This Decision, - Preparing Documentation Together With Decisions, Consents And Other Elements Necessary To Obtain A Water Law Decision, And Obtaining This Decision. This Task Includes Determining The Coastline By Decision Of The Minister Of Infrastructure Along With Separating The Property To Be Taken Over By The Polish Waters State Holding, - Preparing Documentation Together With Decisions, Consents And Other Elements Necessary To Obtain A Construction Permit Decision In Accordance With The Construction Law Act Or To Obtain A Decision On Permission To Implement An Investment In Accordance With The Act On Detailed Rules For Preparation For Implementation In The Field Of Flood Protection Structures, - Preparation Of An Executive Design Together With Construction Drawings, Bill Of Quantities, Investors Cost Estimate And Specifications For The Execution And Acceptance Of Construction Works. 2) Execution Of An Optional Order (Hereinafter Referred To As The Option Or Subject Of The Option), Consisting In The Exercise Of Authors Supervision Over The Implementation Of Construction Works, Performed On The Basis Of The Design Documentation Referred To In Point 1. The Ordering Party Envisages The Application Of The Op Law
|