|
Bids Are invited for Repair And Overhauling Service - Com/1408/Jal/Ddwp/Erdd O/L-26/A Offloading Refit Of Ddwp Of In Asset Erdd-26; Any Other Suitable Brand; Yes; Buyer Premises, Service Provider Premises - Ins Jalashwa Erdd-26(Repaires & Refit Of Underwater Work Package Including Dry Dock)Hullfollowing Points Are Applicable For All Relevant Dls And Shipyard To Consider And Quote Accordingly. (A) All Survey Reports And Certificates Submitted To Ship Staff Should Be Authenticated By Class Authority (Irs/ Lrs/ Abs).(B) All Spare Parts/ Equipments/ Machinery/ Oil/ Grease/ Material To Be Procured, Supplied By Shipyard Are To Be Cleared By Ss Prior Application Or Fitment.(C) On Completion Of Renewals/ Repairs, A Hull Survey Report As Per Navy Standard Format In Respect Of Entire U/W Hull To Be Prepared In 07 Copies And Submitted To Coa. (D) On Completion Of All Uw Jobs And Dd Routines And Post Final Undocking Of The Vessel, 07 Copies Of Docking Report Forms As Per Navy Standard Format In Respect Of Entire U/W Hull Steel Renewal (With Exact Locations/ Area) And Painting (With Oem Guarantee Certificate), Uw Valves, Anodes Etc To Be Filled By The Shipyard And Submitted To Coa. Seven Copies Of Docking Report Forms To Be Provided By The Ship.(E) All Hot Work Job Involves Degutting And Regutting Of Mfmb Lagging And Panelling In The Vicinity Of Hot Work Area And In Adjacent Compartments.(F) Where Ever Complete Paint Scheme Is To Be Renewed. Shipyard To Procure Paint From Ihq Approved Vendors (Jotun/ Akzo Nobel/ Sigma Etc) And Apply Paint Scheme Accordingly. (G) Surface Preparation Standards Post Hot Work And Prior Paint Application Is Defined In No 53/16. Shipyards To Comply Accordingly. , 00001Uw Hull Cleaningclean Underwater Portion Of Hull Using Hydro Jetting With Maximum Pressure Not Exceeding 3000 P.S.I. And Scrap Marine Growth Including Boot Top Area, Shaft Brackets, Rope Guards, Eddy Plates, Rudders Sea Chests/ Tubes Etc Iaw No 53/16 (U/W Area 4000 Sqm & Boot Top Area 1000 Sqm). Quote To Be Inclusive Of Scaffolding/ Staging. , 00002Uw Hull Gratingsopening And Closing Of Gratings Of Sea Tube Within 24 Hours Of Docking And Closing All Essential Gratings Post Survey/ Repairs Along With Sealing Of Nut Bolts Using Araldite Putty. , 00003Uw Hull Visual Surveycarryout 100% Visual Survey Of External Uw Hull Including Boot Top Area Up To 500 Mm Above Top Boot Top Line In Accordance With No 01/15. 07 Copies Of Hull Survey Report In Navy Standard Format Be Submitted To Coa. , 00004Uw Hull Usg Surveycarryout Usg Survey Of External Uw Hull Including Boot Top Area Up To 500 Mm Above Top Boot Top Line In Accordance With No 01/15. 07 Copies Of Hull Survey Report In Navy Standard Format Be Submitted To Coa. , 00005Uw Hull Repair/ Renewalrepair/ Renewal Of Uw Hull Structure Post Completion Of Visual & Usg Survey I.A.W No 01/15 And As Recommended By Hitu(V) Or As Per Hull Survey Report. Material To Be Used – Abs Grade A Steel Plates. Steel Plates To Be Supplied By Hsl. Dp Test To Be Carried Out At All Hot Work Areas. , 00006Uw Hull Maintenance Paintingmaintenance Painting Of Uw Hull To Be Carried Out. All Seven Coats Of Paints To Be Catered For Respective Indicated Locations. Cost Shall Include Surface Preparation (Grit Blasting) And Staging Requirements. To Be Undertaken As Per Oem/ Hitu/ Qc Recommendations. Cater For 20% Area Of Uw Hull (2500 Sqm). Paint Scheme: M/S Sigma Ppg. Paint To Be Procured By Hsl , 00007Uw Hull One Full Coat Of Anti Fouling Paintone Full Coat Of Anti Fouling Painting On Entire Uw Hull Including Boot Top Area To Be Carried Out. To Be Undertaken As Per Oem/ Hitu/ Qc Recommendations. Cost Shall Include Surface Preparation (Sweep Blasting) And Staging Requirements. Area Of Uw Hull: 4000 Sqm, Boot Top Area: 1000 Sqm. Paint Scheme: M/S Sigma. Paint To Be Procured By Hsl. , 00008Uw Tanks Aptapt Of Uw Tanks To Be Undertaken Wherever Repairs/ Hot Work Carried Out. Cost Shall Include The Degutting, Cutting, Welding, Staging And Yard Material. , 00009Uw Tanks Maintenance Paintingcarryout Maintenance Painting On Uw Internal Tanks. To Be Undertaken As Per Oem/ Hitu/ Qc Recommendations. Cost Shall Include Surface Preparation (St 3 Mechanical Cleaning) And Staging Requirements. Paint Scheme: M/S Jotun. Paint To Be Procured By Hsl , 00010Bilge Maintenance Paintingcarry Out Bilge Maintenance Painting In Machinery Compartments. Work Includes Surface Preparation Using Hand Tools/ Mechanical Cleaning And Preserving Using Llps I.A.W No 53/16 Post Completion Of Surface Preparation. Paint Scheme: M/S Jotun. Paint To Be Procured By Hsl , 00011Anchor & Chain Cablecarryout Blanking Of Anchor Hawse Pipe. Cost Shall Include The Degutting, Cutting, Welding Staging And Yard Material. , 00012Uw Openings Blanking Carryout Blanking Of Non-Essential Uw Openings & Obds. Cost Shall Include The Degutting, Cutting, Welding, Staging And Yard Material. , 00013Uw Openings Survey/ Repairs/ Ptcarryout Survey, Repairs And Pressure Testing Of Essential Uw Openings. Cost Shall Include The Degutting, Cutting, Welding Staging And Yard Material. , 00014Uw Tanks Sacrificial Anodescarryout Renewal Of Sacrificial Anodes If Consumed More Than 50% In Uw Tanks. Anode Type: Mk Ii. Sacrificial Anodes Fitment By Nut And Bolt , 00015Uw Hull Sacrificial Anodescarryout Renewal Of Sacrificial Anodes If Consumed More Than 50% On Uw Hull. Anode Type: Mk V & Mk Vi. , 00016Draught Markscarryout Renewal Of Missing/ Corroded Draught Marks. Paint Draught Marks (White Paint) At 08 Locations. Fwd (Port & Stbd), Midship (Port & Stbd), Aft (Port & Stbd) And Aft Cut-Up (Port & Stbd). , 00017Stern Gatecarryout Securing Of Stern Gate Using Dog Bolt Or By Full Welding. , Engineeringdefinition Of Overhauling Of Valve: Overhauling Refers Remove The Valve From The System And Blank The Opening. Transport To Shop Floor And Dismantling. Lapping Of Valve Seat & Valve Disc. Carry Out Machining Of Valve Seat. Renewal Of Gland O Ring Or Gland Packing. Renewal Of Valve Disc O Ring (Mat - Neoprene Rubber). Renewal Of Gland Studs & Nuts And Renewal Of All Valve Body Studs & Nuts. Renewal Of Rubber Seat Seal In Butterfly Type Of Valves. Renewal Of Joints And Gaskets. Greasing Of Valve Spindle And Smoothing Its Operation. Pressure Testing Of Valve Up To 1.5 Times Of Designed/ Rated / Pre-Determined Pressure In Terms Of Kg/Cm2 (Both Side Of Valve & Body). Carry Out The Fitment Of Valves Into System. Carry Out The Trials Of Full System In Presence Of Ship Staff And Rectify Leaks/ Defects If Any Observed During Trials. This Definition Is For All Valves Projected In The Work Package. , 10001Propellercarryout Removal Of Propeller. Cost Shall Include The Degutting, Cutting, Welding Staging And Yard Material. Cost Shall Include The Degutting, Cutting, Welding Staging And Yard Material. Packaging/ Preservation Of The Removed Propellers And Thereafter Its Transportation To Nd(V)/ Mo(V) Shall Be Catered , 10002Shaft Linescarryout Removal Of Tail Shafts Followed By Blanking (Internally And Externally) And Pressure Testing Of Stern Tube. Cost Shall Include The Degutting, Cutting, Welding, Staging, Yard Material, Dp Test And Removal Of Deep Sea Seal. Packaging/ Preservation Of The Removed Shafts And Thereafter Its Transportation To Nd(V)/ Mo(V) Shall Be Catered. , 10003Ruddercarryout Removal Of Rudder Followed By Blanking And Pressure Testing Of Housing. Cost Shall Include The Degutting, Cutting, Welding, Staging, Yard Material And Dp Test. Packaging Of The Removed Shafts And Thereafter Its Transportation To Nd(V)/ Mo(V) Shall Be Catered. , 10004Steering Gearcarryout Degutting Of Steering Gear System To Facilitate Removal Of Rudder. Cost Shall Include The Degutting, Cutting, Welding Staging And Yard Material. Packaging/ Preservation Of The Removed Items And Thereafter Its Transportation To Nd(V)/ Mo(V) Shall Be Catered. , 10005Mbc Ac Plantcarryout Removal Of Mbc Ac Plant. Work Involves Cutting Of Technical Window On Ships Side, Degutting Of System Pipes, Shipping Out Of Mbc Ac Plants, Closing Of Technical Window And Regutting Of System Pipes. Cost Shall Include The Degutting, Cutting, Welding Staging And Yard Material. Packaging/ Preservation Of The Removed Items And Thereafter Its Transportation To Nd(V)/ Mo(V) Shall Be Catered. Oem M/S Johnson Controls Assistance May Be Taken For Degutting & Preservation Of Plants. , 10006Uw Valvescarryout Overhauling Of Uw Valves Of Various Dimensions. Cost Shall Include Pt Of Valves And Removal/ Fitment. Valve Sizes Varies From 150 Mm To 350 Mm. , Electrical20001em Logcarryout Removal Of Transducer With Jb Of Em Log Located At Mmr I, Followed By Blanking Of Opening. Cost Shall Include The Degutting, Cutting, Welding, Staging, Yard Material And Dp Test. , 20002Echo Soundercarryout Removal Of Transducer With Jb Of Echo Sounder Located At Sd Store, Followed By Blanking Of Opening. Cost Shall Include The Degutting, Cutting, Welding Staging, Yard Material And Dp Test. , 20003Iccp Di-Electric Shieldrepair Of Iccp Di-Electric Shield Of Anodes (06) And Res (02) If Found Damaged. , Administrative Servicesas1dining Hall40 Seater Dining Hall For Officers With Tv And Cable Connection , As2dining Hall300 Seater Dining Hall For Sailors With Tv And Cable Connection , As3washrooms For Shipfour Separate Shore Toilets And Wash Rooms For Ships Officers And Crew Suitable For 40 Officers And 300 Sailors. Payment At Actuals. , As4transport For Nd(V) Project Monitoring Teamtwo A/C Car For Oi/C Pmt And Refit Coordinators For 12 Hrs Or 120 Kms/ Day Whichever Is Less. Payment At Actuals. Note: Model/ Vintage Of Cars Should Be Less Than 03 Years Old View Technical/ Safety Concern. , As5garbage Clearancegarbage Clearance From Ship For Entire Refit Duration. Payment At Actuals. , As6kitchenprovide One In Number Kitchen/Cooking Area To Cater For Food Preparation Of 300 Personnel For The Duration Of Dry Docking At Hsl. Kitchen To Be Equipped With Gas Stoves, Gas Connection And Provision Of Lpg To Be Made By Hsl If Required/ Non Supply By Bvy(V). , Technical Servicests1wharfagewharfage And Wet Basin Facility/ Alongside Hire Charges For The Indicated Duration Inclusive Of One Separate Gangway For Pre-Dd Preparative Activities. Payment At Actuals. , Ts2docking & Undocking Chargesdocking & Undocking Charges – One Version (Version I). Docking Is To Be Carried Out As Per Navy Approved Docking Plan. , Ts3dock Blocks Preparationdock Blocks Preparation – Version I, Setting Of Blocks And Dock Cleaning. , Ts4tug And Pilotagetug And Pilotage To Be Arranged By Shipyard (Entering Shipyard Wharf, Dry Docking Version I And Departing Shipyard Wharf). Payment At Actuals. , Ts5mooring/ Unmooringmooring / Unmooring And Line Handling For Each Operation , Ts6third Party Inspection For Dock Block Preparationthird Party Inspection For Dock Block Preparation – Shipyard To Arrange The Navy Approved Third Party Inspection Agency (Irs/ Lrs/ Abs) For Checking The Arrangement Of Dock Blocks Prepared By Shipyard As Per The Ihq Mod(N) Approved Docking Plan. Post Inspection Of Dock Block Preparation, Duly Recommended Certificate By Third Party Inspection Agency (Irs/ Lrs/ Abs) To Be Handed Over To Navy , Ts7dock Hiredock Hire Charges For The Quoted Duration Including One Separate Gangway, Crane Facility Etc. , Ts8power Supplysupply Of Electrical Power Minimum (Mandatory), 450 Volts, 60 Hz, 800A, 3 Phase Including Connection/ Disconnection Of Power Cable. Shipyard To Install A Calibrated And Operational Energy Meter In The Supply Line. Payment Only At Actuals For Electricity Consumption And To Be Strictly Based On Calibrated Energy Reading. Kwh Meter Calibration Certificate To Be Provided By Shipyard.Estimated 9000 Kwh Per Day X 60 Days (To Be Charged Based On Actual Power Consumed. To Be Recorded And Signed By Rmt). , Ts9power Supplyconnection & Disconnection Of Power Cable And Earthing Cables. , Ts10earthingship To Be Earthed At Eight Places. Earthing Cable To Be Provided By Shipyard. , Ts11fire Main Connectionprovide Five Fire Main Lines At Pressure Of 08 Bar For Entire Dd Duration. 05 Lines X 75 Days. Shipyard To Fit Reference Pressure Gauge At Discharge Line. Calibration Certificate Of Pressure Gauge To Be Submitted. Payment At Actuals. , Ts12fire Main Connectionconnection & Disconnection (5 Lines) , Ts13fresh Watersupply Of Fresh Water 60 Tons/ Day For Duration Of Wharfage (15 Days). Payment At Actuals. , Ts14fresh Waterconnection And Disconnection Of Hose. , Ts15mobile Chilled Water Plantprovide 01 Mobile Chilled Water Plant Of 220 Tr Capacity With A Discharge Pressure Of 100 Psi With Hose Connections During Entire Refit Duration Of Ship Round The Clock. Adequate Flexible Hoses To Carry Chilled Water From Mobile Chilled Water Plant To Accommodation Areas In Ships Superstructure & Below Decks To Be Catered By Shipyard. Payment At Actuals. To Be Recorded And Signed By Rmt. , Ts16carry Away Pipesprovide Carry Away Pipes (4 Inch Dia, 25 Nos) For Entire Dd Duration Of 60 Days. Fixing And Removal Of Carry Away Pipes To Be Catered By Shipyard. , Ts17cranecrane Services For Ships Own Requirement (For Handling Ship Provision/ Spares). Crane To Be Provided With Dynamometer For Recording Loads Being Lifted. Payment At Actuals, To Be Recorded And Signed By Rmt. , Ts18ventilation Onboard Shipprovision Of 30 Portable Intake/ Exhaust Blowers Of 10 Kw Rating With Adequate Hosing Arrangement On An As Required Basis. Payment At An Actual. , Ts19hiring Of Fire Sentriesprovision Of 18 Fire Sentries (Including 02 Supervisors) For 12 Hrs Per Day. No Of Sentries Required Will Be Intimated Based On Shipyards Requisitions For Hot Work Received On The Previous Day. Payment At Actuals. , Ts20hiring Of Split Acsprovision, Installation & Maintenance Of 05 Nos Split Acs Of 1.5 Tr Each In Specific Locations Onboard Ship Catering For Duty Watch Personnel Staying Onboard During The Entire Dd Duration Of 60 Days. Payment At Actuals. To Be Recorded And Signed By Rmt. , Ts21transport For Machineryprovision Of Tractor With Trolley For Shifting Of Machinery/ Items From Ship To Nd(V)/Mo(V). , Ts22transport For Materialprovision Of Three Tonner For Transport Of Material/ Equipment/ Spares From Ship To Nd(V)/ Mo(V). , Ts23fork Liftservices Of 01 Forklift For Duration Of Refit For Ships Own Requirement. Payment At Actuals, To Be Recorded And Signed By Rmt. .
|