|
The Subject Of The Order Is Modernization Of Water Supply Infrastructure In The Annopol Commune. The Aim Of The Order Is To Improve The Quality Of Drinking Water Supplied Through The Water Supply System In The Annopol Commune. The Goal Will Be Achieved Thanks To, Among Others: Reconstruction Of The Emergency Section Of The Network Or Renovation Of 8 Water Supply Wells In The Commune. The Need To Take Care Of The Good Condition Of The Water Supply Infrastructure Results, Among Others, From: From The Act Of June 7, 2001 On Collective Water Supply And Collective Sewage Disposal, According To Which The Operator Of The Water And Sewage System Is Obliged To Ensure The Ability Of Its Water Supply And Sewage Equipment To Supply Water In The Required Quantity And At The Appropriate Pressure, As Well As To Supply Water And Discharge Sewage In A Continuous And Reliable Manner, As Well As To Ensure The Appropriate Quality Of The Supplied Water And Discharged Sewage. Due To The Failure Rate Of Deep-Well Pumps That Draw Water For All Residents Of The Commune, The Investment Is Justified, And Its Implementation Will Lead To The Achievement Of The Main Goal. The Aim Of The Order Is Also To Reduce Water Losses In The Commune. Thanks To The Use Of A Water Supply Network Monitoring System And The Reconstruction Of The Emergency Section Of The Water Supply, The Amount Of Wasted Water Should Be Limited. The Subject Of The Order Includes Four Tasks: 1) Expansion Of The Water Supply Network In Ul. Leśna In Annopol. A Task Involving The Construction Of A New Section Of The Water Supply Network (In A Place Where The Water Supply Network Exists) In An Excavation Parallel To The Existing (Replaced) Section Of The Network. The Network With A Total Length Of 491.4 M Will Be Made Of Pe100rc Sdr17 Pipes. As Part Of The Works, It Is Planned To Connect The Existing Water Supply Connections To The New Network (No New Connections Will Be Built). The Task Will Be Carried Out On Plots: 993, 187, 68, 67/1, 66, 65, 1032, 63/1, 62. 2) Reconstruction Of Water Intakes. The Task Includes The Reconstruction Of Eight Water Supply Stations (Water Intakes) In The Following Towns: Annopol (Plot No. 506, 503/4, 504/2), Dąbrowa (Plot No. 328/2, 327/2), Natalin (Plot No. 6319), Opoczka (Plot No. 215/2, 216/4), Anielin (Plot No. 226/2), Jakubowice (Plot No. 294/3, 12/8), Opoka (Plot No. 1639), Zastocze (Plot No. No. 32/1, 34/1). The Renovations Will Include: Installation Of Hydrophore Sets, Replacement Of Pressure Pipelines, Replacement Of Chlorinator Sets And Replacement Of Submersible Pumps. 3) Construction Of A Water Supply Network Monitoring System. The Task Includes The Construction Of A Water Flow Monitoring System In The Water Supply Network In The Commune Based On Battery Electromagnetic Flow Meters. It Is Planned To Install 17 Monitoring Points On The Water Supply Network In The Following Locations: Jakubowice, Plot No. 3, Janiszów Plot No. 777/3, Kosin, Plot No. 2015, Opoka, Plot No. 163
|